450 likes | 566 Views
Yate health centre and locality hub development. 22 September 2009. Looking at the rear of the building. Walking through from Sure Start to main reception – Ground floor. Main reception – Ground floor (entering from rear entrance). Main reception area – Ground floor.
E N D
Yate health centre and locality hub development 22 September 2009
Walking through from Sure Start to main reception – Ground floor
Looking back towards Sure Start entry/exit end of corridor at building rear
Ground floor main reception (main entrance far left, waiting room immediate left)