1 / 19

Workshop on “Mathematical Engineering”

Workshop on “Mathematical Engineering”. Dr. Vathsal , Director ER&IPR, Room No. 348, DRDO Bhawan, New Delhi- 110011. Venue: ECE Dept, IISc Bangalore Date: 09/06/07. Advanced Research in Mathematical Engineering with FOCI in. Communication Control Signal Processing. Aim.

Download Presentation

Workshop on “Mathematical Engineering”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop on “Mathematical Engineering” Dr. Vathsal, Director ER&IPR, Room No. 348, DRDO Bhawan, New Delhi- 110011 Venue: ECE Dept, IISc Bangalore Date: 09/06/07

  2. Advanced Research in Mathematical Engineering with FOCI in • Communication • Control • Signal Processing Aim To achieve and maintain Electro magnetic dominance in theaters such as J&K.

  3. Through Jan 27, 2001 Chaired by Dr. V.K. Aatre (Ex) SA to RM, DRDO Hqr Department of Electrical communication Engineering with – Ambit of Scientific Discourse and Transactional Arrangements Definition Meeting

  4. Labs Invited • ADE - Dr. Jharna Majumdar • CAIR - Sh. N Sitaram + 6 Scientists (Sh. G Adithan, Dr. Giris S Deodare, TS Raghavan, MR Kishorey, Dr. Vijay V Patel, Dr. N Ramamoorthy) • DLRL • DARE (ASIEO) • LASTEC • LRDE • NPOL – Sh. V Chander • MTRDC • RCI - Sh KVSS Prasad Rao • SAG – Prof. CE Veni Madhavan

  5. Transcational Arrangements • Creation & Sustenance of Intellectual and research infrastructure • Performance of imagination-driver generic basic research aimed at expanding and deepening the relevant knowledge base. funding for (a) and (b) will be through ER at DRDO HQrs) • Utilization of both (a) and (b) above by acquiring research services through CARS-a new transcational instrument planned for use from April 01, 2001.

  6. Topics Suggested By NPOL. Signal & Noise Modeling • Enabling optimal / sub optimal design of systems • Furnishing the type of information that can be extracted from the system • Facilitating an effective evaluation of the system performance in diverse situation.

  7. CFAR Processing • Cell Averaging CFAR processing and its Variants ( like cell average grater of – CAGO, Cell average smaller of–CASO, Rank Cursor –RC and order statistics –OS • Distribution free CFAR Processing and • Adaptive filters

  8. Adaptive Array Processing • Statistical modeling of sensor signal characteristics, when flexible sensor array is towed through fluid medium, as a function of towing speed and sea conditions. • Analytical methods to predict the performance degradation of various adaptive beam formers with a correlated displacement from sensor to sensor. • Influence of various spatio- temporal ambient noise conditions • Develop adaptive beam formers which are robust to array imperfections.

  9. Data Fusion • Fusion of data to refine measurements like bearing, range spectral characteristics. • Fusion of decision of individual processor attached to a given sensor. • CABS • Space Time Adaptive Processing for Airborne Radars and Anti- Jamming GPS.

  10. LRDE LRDE • Space – time adaptive signal processing techniques for Radar • Wavelet based techniques for Radar clutter models. • Application of Neural Networks for modelling and tracking • Detection of multiple targets from multiple radar sensors. • Parametric / Non-parametric estimation for stochastic processors useful in radars. • CFAR Techniques for radar.

  11. MTRDC • Synthesis Techniques for Electron beams / guns. • Particle – in – cell / (PIC) Modelling of Microwave tubes. • Optimization of Microwave tube design

  12. DARE (ASIEO) Problem of modeling a fully coherent Multi Mode Radar (MMR) and associated Air to Air Missile. Model would include detection of a fighter aircraft target, acquisition logic and tracking (in range, azimuth, elevation & Doppler). It would also contain a missile launch, gathering and guidance model. Missile miss distance will be used as a final parameter to assess the performance of the radar guided weapon system.

  13. MOC Milestones & Achievements Start of MOC - 20 June 2001 Cost of MoC - Rs 222.5 Lakhs PGG & RPIG • Guided by PGG – 5 • Implemented by RPIG - 5 Proposal for conditional program • May 19, 2006 • Updated June 7, 2006

  14. Achievements • Journal papers – 34 • Conference papers – 99 • Technical papers – 72 • Visit of leading scientists from abroad – 33 • Seminars – 38 • Instructional Workshops • Estimation & Control • Wireless Technologies • Wavelet Transforms. • Patents - 2

  15. New MoC Previous I MoC – Aug 23, 2002 New II MoC – 1/9/06 – Aug 31, 2011 No cost to DRDO – extension of one year at the end of the 5 year period. Advisor Professor V.K. Aatre Visiting professor, IISc

  16. Expansion of Activities • Supporting a larger number of faculty • Expanding and improving the distinguished visitor program • Setting up a server dedicated to maintenance of a website • Encouraging and facilitating the delivery of seminars & short courses by visiting faculty and/ or IISc faculty either outsite at a DRDO Laboratory or else at IISc itself. • Seminars at IISc will be made open to students of local institutions.

  17. Improvement in the area of Interaction • Annual one day review • Providing workstation & desk space in the DRDO-IISc facility for day visitors to IISc from DRDO Laboratories.

  18. Meeting for Renewal / New MoC • Shri N. Sitaram, Chairman, Director CAIR. • Dr. S Vathsal,Member Secretary, Director ER&IPR . • Air Cmde Katarki, Member (CABS • Dr. Sudhir Kamath, Member (MTRDC), Sc ‘F’. • Dr. N Rama Murthy, Co-opted , Member (CAIR), Sc‘F’ The committee met on 04 Jan 2006 in CAIR. After looking into achievements & plan for new MOC, it was decided to continue maintaining such a program. MOC was signed on 29th Aug 2006. RPIG has been conducted.

  19. THANK YOU

More Related