An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Belkomur Project History In the middle of the 1930s a railway construction began in the planned Belkomur location. In 1944 the railway Kotlas-Vorkuta connected Pechora Coal Basin and Cherepovets Metallurgical Works. In 1953-1954 the railway construction in the Russian Polar Region was stopped.

  2. In 1995 a large-scale meridional project was proposed. The aim of the project was to link the cities of Arkhangelsk, Syktyvkar, Kudymkar and Perm by means of a railway called Belkomur. The project design was based upon the General Scheme of Railways Development in Russian European North.

  3. Railway network development in the Urals and Russian European North

  4. In early 1998 the company Belkomur started construction of the northern part of the railway simultaneously from both directions.

  5. Construction of the bridge over the r. Vashka, Udorsky District, the Republic of Komi

  6. The project implies a construction of a new aligning railway 1155 km long, including a new construction of 715 km, the rest is reconstruction and modernizing of the existing lines. The Idea of Belkomur Project

  7. Belkomur consists of two parts: Northern and Southern

  8. Belkomur consists of two parts: Northern and Southern

  9. The new railway is of strategic importance for Russia since it will provide a direct connection of the Urals and the Republic of Komi to the ice-free ports in Arkhangelsk, Murmansk and Northern Europe.

  10. Belkomur Project Objectives • Railway network development in Russian European North • Infrastructural dead-ends liquidation • Reduction oftransportation distances • Including idle territories into economic activities • Railway transportation cost savings

  11. Project Implementation Stages 1st stage: Northern Link –construction of Karpogory-Vendinga rail way 1st order – construction of Karpogory-Vendinga rail way by start-up complex 2nd order – reaching full capacity of the rail way Karpogory-Vendinga

  12. Project Implementation Stages 2nd stage: Southern Link – construction of Syktyvkar-Perm rail way1st order – construction of Syktyvkar-Perm rail way2nd order – reaching full capacity of the rail way Syktyvkar-Perm

  13. Integrated program for industrial and infrastructural development of the Republic of Komi, Perm Region and Arkhangelsk Region

  14. About RUR 110 bln. of total investments till 2012. 23 mln. tons of cargo flow per annum (2006) Over RUR 20 bln. industrial output growth by2010-2012. 40 - 50% cargo flow increase by 2010-2012. Projects included in General Scheme (2007) Yarega Mining and Chemical Plant construction Vorkuta project Bauxite and Alumina Plant construction Step Project Udora and Troitsko-Pechorsk Pulp-And-Paper mills projects Brief description of the project participantsThe Republic of Komi

  15. Perm RegionBereznikovo-Solikamsk Industrial Hub RUR 120 bln. of total investments till 2012. Over RUR 20 bln. industrial output growth by 2010-2012. 30 – 40 % cargo flow increase by 2010-2012.Projects included in the Complex Program (2007) JSC Uralkaliy project JSC Silvinit project JSC Solikamskburprom project LLC Soda-Chlorat project JSC Bereznikovsky Sodium Plant project

  16. Arkhangelsk Region Deep-Water Port 28 mln. tons of annual cargo turnover RUR 25 bln. of total public and private investments Over 9,000 jobs Servicing ships up to 70,000 tons dead-weight 55 km rail way included in the Rail Ways Development Strategy till 2030

  17. Projected cargo flows

  18. Construction of the new railway Belkomur within Eurasian Transport Corridor

  19. Construction of the new railway Solikamsk – Gainy – Syktyvkar – Arkhangelsk within transport corridorNorth East – West (NEW)

  20. The major interregional projects within Russian part of the Northern Transport Corridor • Karpogory-Vendinga-Syktyvkar-Kudymkar-Perm • railway • Ledmozero-Kochkoma railway • Kotlas motor-road bridge • Road transport communication within roadway networks in the Republic of Karelia and Arkhangelsk Region • Road transport communication within roadway networks in Arkhangelsk Region and the Republic of Komi

  21. A new railway Solikamsk – Gainy – Syktyvkar – Karpogory – Arkhangelsk (Belkomur) Total railway length 1155 km New construction 715 km RUR 118 bln. of total investments