90 likes | 227 Views
Data extraction at various level. Data Extraction – Project Arrow Office. Daily data of various fields of Project Arrow office is monitored at various level with the help of “Data Extraction Tool”- Accounts MIS Postmaster of Project Arrow Office to ensure this tool is installed in his office.
E N D
Data Extraction – Project Arrow Office • Daily data of various fields of Project Arrow office is monitored at various level with the help of “Data Extraction Tool”- Accounts MIS • Postmaster of Project Arrow Office to ensure this tool is installed in his office
Data Extraction – Three areas • Meghadoot • Account MIS- Project Arrow Office to be configured in 6.5 version • Sanchay post • Speednet • 3.1 version
How Data extraction takes place? • Meghadoot • After “day end” in each application- automatic • Sanchay Post • Exe file to be executed to send data to “data extraction tool” (With latest patch this is not required) • Speednet • Speed post data gets transferred to Postman module from speednet in offices where speednet 3.1 is installed
Project Arrow Data Extraction Fields • Point of Sale • 8 items • Postman Module • 27 items • Treasury • 01 item • Sanchay Post • 22 items
Project Arrow Data Extraction Fields….. • Data will be in encrypted form and this can not be manipulated by any body • Data of Project Arrow Offices is monitored at all level and therefore please ensure that “day end” is performed in all the modules daily • Please ensure “exe” file is executed at the end of the day in Sanchay module
Project Arrow Data Extraction Fields….. • Data extraction is either done after performing day end or scheduled
Accessing other modules at DO/RO/CO/Dte level • eMO • User name dop eMO • Password eMO • ePayment • User name dop • Password ePmt • Speednet MIS • User name dop • Password india