1 / 17

11. Air Movement Control Between and Within Cleanrooms

11. Air Movement Control Between and Within Cleanrooms. Purposes. To show that a cleanroom is working correctly, it is necessary to demonstrate that no contamination infiltrates into the cleanroom from dirtier adjacent areas. Cleanroom Containment Leak Testing

miriam
Download Presentation

11. Air Movement Control Between and Within Cleanrooms

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 11. Air Movement Control Between and Within Cleanrooms

  2. Purposes • To show that a cleanroom is working correctly, it is necessary to demonstrate that no contamination infiltrates into the cleanroom from dirtier adjacent areas. • Cleanroom Containment Leak Testing • Airborne contamination: doors and hatches, holes and cracks in the walls, ceilings and other parts of the cleanroom fabric

  3. Contamination can be pushed into the cleanroom at • ceiling-to-wall interface • filter and lighting housings-to-ceiling interfaces • ceiling-to-column interface • the cladding of the ceiling support pillars • Service plenums and the entry of services into the cleanroom: electrical sockets and switches, and other types of services providers. Particularly difficult to foresee and control in a negatively pressurized containment room.

  4. Methods of checking infiltration • Smoke test (dust test) • flow direction: open door, or through the cracks around a closed door, cracks at the walls, ceiling, floor and filter housings, service ducts or conduits. • Difficulty • where the containment originates from may be unknown, and it is often difficult to find the places to release test smoke.

  5. Containment leak testing • Timing • handing it over to the user • major reconstruction work has been carried out • ISO 14644-2 lists the ‘containment leak’ test as an ‘optional’ test and suggest a re-testing interval of two years

  6. Air Movement Control within a Cleanroom • sufficient air movement • dilute, or remove airborne contamination prevent a build-up of contamination • turbulently ventilated cleanroom: • good mixing, critical areas: where the product is exposed to the risk of contamination • unidirectional flow cleanroom • critical areas should be supplied with air coming directly from the high efficiency filters. However, problems may be encountered because of: • heat rising from the machinery and disrupting the airflow • obstructions preventing the supply air getting to the critical area • obstructions, or the machinery shape, turning the unidirectional flow into turbulent flow • contamination being entrained into the clean air.

  7. Air movement visualization • Objective: sufficient clean air gets to the critical areas qualitative methods • Visualization: • Streamers • smoke or particle streams • Streamers (threads or tapes): • high surface-area-to-weight ratio, ex. recording tapes • A horizontal flow: 0.5 m/s (100 ft/min) streamer 45° to the horizontal • about 1m/s (200 ft/min) almost horizontal.

  8. Streamers

  9. smoke or particle streams • oil smoke  contamination • Water vapour : from solid C02 (dry ice) or by nebulizing water

  10. putter and smoke tube': • Titanium tetrachloride (TiCl4)produces acid  corrodes some surfaces harmful to sensitive machinery or harm the operator's lungs.

  11. Air Movement in turbulently ventilated rooms • working well: quickly dispersed • not working well Areas: not disperse quickly contamination build up  improved by adjusting the air supply diffuser blades, removing an obstruction, moving a machine.

  12. Air Movement in unidirectional flow • air moves in lines • Visualisation techniques: smoke stream • Still picture

  13. Air velocity and Direction measurement • A permanent record: velocity and direction

  14. Recovery Test Method • A quantitative approach • A burst of test particles introduced into the area to be tested mixed with their surroundingsthe airborne particle count should be measured, • A useful endpoint is one-hundredth of the original concentration, and the time taken to reach there can be used as an index of efficiency.