1 / 10

Cryogenics observations during the 75 and 50 ns bunch spacing operation

Cryogenics observations during the 75 and 50 ns bunch spacing operation. L. Tavian With the contribution of CRG-OA BCWG, 23 November 2010. Basic cooling s cheme of beam screens. ~ 53 m. Calibration of 3 loops (21L3, 33 L6 & 13R7):

mirit
Download Presentation

Cryogenics observations during the 75 and 50 ns bunch spacing operation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cryogenics observations during the 75 and 50 ns bunch spacing operation L. Tavian With the contribution of CRG-OA BCWG, 23 November 2010

  2. Basic cooling scheme of beam screens ~ 53 m • Calibration of 3 loops (21L3, 33 L6 & 13R7): • Unknowns: Flow coefficient of the valves Static heat inleaks • Application of different electrical heating EH to solve the system EH C Support posts & 60 A CL

  3. Calibration results Factor 2 on the heat inleak still to be understood ! Fit of the electrical heating after calibration: Accuracy: +/- 0.5 W Response time: 45 min

  4. 75 ns, up to 680 b/beam, 450 GeV No visible e-cloud activity !

  5. 75 ns, up to 680 b (beam1), 450 GeV No visible e-cloud activity !

  6. 75 ns, up to 108 b/beam, 450 GeV No visible e-cloud activity !

  7. 50 ns, up to 108 b (Beam2), 3.5 TeV Reduced e-cloud activity ? ~ 10 mW/m on beam2

  8. To be compared with measurement on 31 October 2010  beam scrubbing effect ! Visible e-cloud activity ~ 20 mW/m per apert.

  9. 50 ns, up to 444 b (Beam1), 450 GeV Visible e-cloud activity ~ 40 mW/m on beam1

  10. Qualitative observation on ITs:75 ns, up to 680 b/beam, 450 GeV - Significant activity at P8 and P2 (cold D1?) - Nothing at P1 and P5 (warm D1?)

More Related