1 / 18

Geosat Follow-On Cal/Val

Geosat Follow-On Cal/Val. Briefing to the NPOESS Integrated Program Office February 2, 2004 John Lillibridge & Bob Cheney NOAA/NESDIS/ORA Laboratory for Satellite Altimetry. Spacecraft & Sensors. Ku-band Altimeter Dual-ƒ Radiometer 4 GPS Receivers Doppler Beacon Laser Retro-reflector

misty
Download Presentation

Geosat Follow-On Cal/Val

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Geosat Follow-On Cal/Val Briefing to the NPOESS Integrated Program Office February 2, 2004 John Lillibridge & Bob Cheney NOAA/NESDIS/ORA Laboratory for Satellite Altimetry

  2. Spacecraft & Sensors • Ku-band Altimeter • Dual-ƒ Radiometer • 4 GPS Receivers • Doppler Beacon • Laser Retro-reflector • Fixed Solar Array • Solid State Memory

  3. A Brief History • Launch: 2/10/1998 from Vandenberg AFB • 6th Anniversary approaching; 8-year nominal lifetime • Initial hardware difficulties • Onboard CPU resets • GPS receivers failed • Loss of primary orbit determination system • Loss of precision time-tagging • Ground-based time-tag unit at NAVSOC: June, 1999 • CPU reset problems solved: November, 1999 • Navy acceptance: November 29, 2000

  4. Altimetry Data Return Start of GDRs Momentum Wheel Anomaly Time-tag Unit Navy Acceptance

  5. Core Activities - U.S. Navy • SPAWAR • Program management • Navy Cal/Val team - CSC contractors • NAVSOC • Satellite Command/Control & Data telemetry • Operational Doppler orbits • NAVO/NRL • Payload Operations Center - ADFC • Near real-time altimetry - GODAE server • DoD data requests

  6. Core Activities - NASA & NOAA • NASA • Wallops Flight Facility • Instrument performance monitoring & Cal/Val • Goddard Space Flight Center • Precise Orbit Determination from laser ranging • Ice-sheet monitoring via altimeter waveforms • NOAA • Final Science-quality Geophysical Data Records (GDRs) • Near real-time Interim GDR • Civilian Data Requests (Foreign & National) • Funding OSU Cal/Val team & GSFC Orbits • Funded CLS for GFO-specific sea-state bias model • Data archive at NODC

  7. Navy/SPAWAR Cal/Val • Precision Time-tag Monitoring • Incentive Fee to Ball Aerospace: • Cycle by cycle data coverage • Radar altimeter noise-floor determination • Water Vapor Radiometer noise determination

  8. Ultra-Stable Oscillator Drift dƒ/ƒ ~ dDt/Dt ~ dh/h ~ 10-7 (0.1 ppm) Doppler Frequency ƒ: 400 MHz dƒ: 40 Hz Record SpacingDt: 0.98 sec dDt: 0.1 msec Range Correction h: 800 km dh: 8 cm

  9. Ultra-Stable Oscillator Clock Drift

  10. NASA Wallops Cal/Val • Altimeter instrument performance • Validate instrumental corrections to range, AGC, SWH • Distribute cal/val data records • Monitor internal calibration mode & provide corrections • Daily Science Data sanity plots • Windspeed monitoring • Attitude Boresight “ABCAL” maneuver analysis

  11. Attitude Adjustment • Mean Off-Nadir angle ~ 0.24° until Feb.’02 • Attitude ~ 0.08° now • Current SDR algorithm “clips” Attitude2

  12. Greenland Heights vs. ETOPO2 • Deviations relative to Geoid+Topography • -40 meter interior offset • Compare with DTM2000 • No waveform retracking

  13. Ohio State Cal/Val • Navy & NOAA products evaluated • Sea surface height residuals • Water vapor correction validation • Orbit error estimates from crossovers

  14. European Partners • CNES - Corsica absolute calibration • CLS - Real-time “DUACS” system • Validation of all corrections • Editing thresholds and engineering flags • Sea surface height, SWH, Wind & Attitude • S.O.S. (U.K.) - SWH/Wind Buoy validation

  15. SSH after orbit error removal

  16. GFO & T/P Sea Surface Height • SSH-MSS residuals: 11 cm for GFO; 10 cm for T/P • Geocenter offsets applied (B. Beckley/GSFC)

  17. NOAA GFO GDR Datasets • Based on final POE laser orbits • State of the Art Corrections • Cycles 37 - 104 on three DVDs • January, 2000 - March, 2003 • Cycles 105 - 118 via ftp • March - November, 2003 • < 10 cm SSH Variability • Cycles 119… with MOE orbits • Daily IGDR files in 3 days NRT

  18. NOAA Funding for GFO $80K NASA/GSFC Orbit Determination $50K Ohio State Cal/Val Team $35K CNES/CLS Sea-State Bias Model $65K NRC Post Doc - Remko Scharroo $230K excluding salaries & NODC support

More Related