850 likes | 871 Views
TRAINING. MBBR BIOREACTOR INTRODUCTION OPERATION AND MAINTENANCE. EEC GLOBAL OFFICES. EEC PACKAGE PLANTS - WASTEWATER. Containerized WWTP 10 – 400 m3/day in Single Containers - Flexebility Quick Start-up - Fully Automatic and Mess Free Meet Any Effluent Requirements.
E N D
TRAINING MBBR BIOREACTOR INTRODUCTION OPERATION AND MAINTENANCE
EEC PACKAGE PLANTS - WASTEWATER • Containerized WWTP • 10 – 400 m3/day in Single Containers - Flexebility • Quick Start-up - Fully Automatic and Mess Free • Meet Any Effluent Requirements.
EEC Package Plants = Flexibility • EEC Technology is based on AMB Bio Media (more on AMB Next page) • EEC Bio are easy to Transport, Move, and Expand • No additional Shelters needed • Quick Start-up. Open the Doors start up your WWTP • Any Capacity, Any Effluent Requirements • Built or Transported in Standard ISO Freight Containers • No Odor – Low Power Requirements
Robust Operation = AMB Bio Media • Assisting Moving Bed (AMB) offer 10 Times the Loading in 1/5 the time • AMB Bio Media = 950 m2/m3 Surface Area inside the EEC-WWTP • AMB = Clog Free Operation & Self Cleaning Systems • Bio Film Grows on the AMB Media and Offer Sheltered & Robust Operation • No Backwash Required. Minimum Service Requirements = Mess Free Operation • EEC Package Plants Meet Stringent Effluent Standards Consistently • AMB Bio media is proprietary design by DAS USA • A sister company of EEC Global Operation LLC
EEC Basic Process • Screen • Settling • Buffer & Feed • Rotation of AMB Bio media by Air • Final Settling & Sludge Recycling • Effluent for Recycling, Irrigation, Toilet Flush, or Meet any Local Standard. • EEC systems can be customized to handle Ammonia and Nutrient Removal
Typical Clients & Applications • Domestic Wastewater in general – Up to 2000 p.e. – 400 m3 – One 40’ MAXI • Shopping Centers • Camps, Military, Schools & Universities • Condominiums & Housing Projects • Hospitals • Remote Locations & Islands • Industrial Wastewater • Contact EEC for WWTP Configurations. Customized WWTP’s are available
POLLUTANTS IN SEWAGE • BOD (BIO CHEMICAL OXYGEN DEMAND) • COD (CHEMICAL OXYGEN DEMAND) • TSS (TOTAL SUSPENDED SOLIDS) • pH • OIL & GREASE • SURFACTANTS
BIOCHEMICAL OXYGEN DEMANDBOD • THE BOD IS AN IMPORTANT MEASURE OF WATER QUALITY. IT IS A MEASURE OF THE AMOUNT OF OXYGEN NEEDED BY BACTERIA AND OTHER ORGANISMS TO OXIDISE THE ORGANIC MATTER PRESENT IN A WATER SAMPLE OVER A PERIOD OF 5 DAYS.
BOD MEASURING EQUIPMENT OXY TOP SYSTEM INCUBATOR FOR BOD
CHEMICAL OXYGEN DEMANDCOD • COD MEASURES ALL ORGANIC CARBON WITH THE EXCEPTION OF SOME AEROMATICS (BENZENE, TOLUENE, PHENOL ETC.), WHICH ARE NOT COMPLETELY OXIDISED IN THE REACTION. • COD IS A CHEMICAL OXIDATION REACTION, • AMMONIA WILL NOT BE OXIDISED
COD MEASUREMENT LANGE HT 200 S CHEMICALS FOR COD, PO4, NO3 AND NO2
TOTAL SUSPENDED SOLIDS • Total suspended solids (TSS) include all particles suspended in water which will not pass through a filter. • As levels of TSS increase, a water body begins to lose its ability to support a diversity of aquatic life. • Suspended solids absorb heat from sunlight, which increases water temperature and subsequently decreases levels of dissolved oxygen (warmer water holds less oxygen than cooler water).
LANGE DR 2800 SPECTRO PHOTOMETER TSS MEASUREMENT
TYPE OF TREATMENT FOR WASTEWATER AEROBIC ANAEROBIC • AEROBIC TREATMENT TAKES PLACE IN PRESENCE OF AIR. • THE ORGANIC POLLUTANTS ARE CONVERTED INTO CARBON DIOXIDE AND WATER • ANAEROBIC TREATMENT TAKES PLACE IN ABSENCE OF AIR. • THE ORGANIC POLLUTANTS ARE CONVERTED BY ANAEROBIC MICROORGANISMS TO A GAS CONTAINING METHANE AND CARBON DIOXIDE.
COMPARISION CONTINUED AEROBIC ANAEROBIC • THERE IS NO SMELL IN THE SURROUNDING AREA • IT CONSUMES MORE ELECTRICAL ENERGY. • THE SLUDGE PRODUCTION IS HIGH • THERE IS SMELL ALL AROUND THE PLANT • THE ENERGY CONSUMPTION IS LOW • THE SLUDGE PRODUCTION IS LOW
DIFFERENT TECHNOLOGIES TO TREAT WASTEWATER ACTIVATED SLUDGE PROCESS EXTENDED AERATION PROCESS SUBMERGED AERATED FIXED FILM (SAFF) MOVING BED BIO REACTOR (MBBR) SEQUENTIAL BATCH REACTOR (SBR) ELECTRO OXIDATION MEMBRANE BIO REACTOR (MBR) ROTATING BIOLOGICAL CONTACTOR (RBC)
ACTIVATED SLUDGE PROCESS • The activated sludge process is a wastewater treatment method in which the carbonaceous organic matter of wastewater provides an energy source for the production of new cells for a mixed population of microorganisms in an aquatic aerobic environment. • The microbes convert carbon into cell tissue and oxidized end products that include carbon dioxide and water.
SUBMERGED AEROBIC FIXED FILM • This technology utilizes an aerobic fixed film process that is a combination submerged attached growth and activated sludge processes. This system is designed to be installed into a two compartment, where the first compartment provides majority of BOD removal, and the second compartment polishes the BOD. Rigid block-type media is submerged within the treatment module, providing surface area for microbial growth.
MOVING BED BIO REACYOR MBBR • In the MBBR bio film technology the bio film grows protected within engineered plastic carriers, which are carefully designed with high internal surface area. These bio film carriers are suspended and thoroughly mixed throughout the water phase. With this technology it is possible to handle extremely high loading conditions without any problems of clogging, and treat industrial and municipal wastewater on a relatively small footprint.
SEQUENTIAL BATCH REACTOR The sequencing batch reactor (SBR) is a fill-and draw activated sludge system for wastewater treatment. In this system, wastewater is added to a single “batch” reactor, treated to remove undesirable components, and then discharged. Equalization, aeration, and clarification can all be achieved using a single batch reactor.
SEQUENTIAL BATCH REACTOR PROCESS Wastewater fills the tank, mixing with biomass that settles during the previous cycle. Air is added to the tank to aid biological growth and felicitate waste reduction. Mixing and Aeration stop during this stage to allow solids to settle. Clarified effluent is discharged. Sludge can be removed during this stage.
ELECTRO OXIDATION • Electrolyser solution is injected into the electrolytic chamber. The electrolyser solution is an electrically charged solution which releases oxidizing agents into the electrolytic chamber. Electrical current is also applied into the electrolytic chamber. Under the dual effect of electrolyser solution, and electrical current the colloidal impurities get de-stabilized resulting in agglomeration and flotation and subsequent removal. Dissolved impurities contributing to BOD / COD also get oxidized due to the oxidizing agents released by the electrolytic solution. The combined effect of these actions results in BOD / COD reduction.
MEMBRANE BIOREACTOR (MBR) • The membrane bioreactor (MBR) process is a technology that consists of a suspended growth biological reactor integrated with an ultrafiltration membrane system, using the hollow fiber membrane. Essentially, the ultrafiltration system replaces the solids separation function of secondary clarifiers and sand filters in a conventional activated sludge system. • Ultrafiltration membranes are immersed in an aeration tank, in direct contact with mixed liquor.
ROTATING BIOLOGICAL CONTACTOR • A rotating biological contactor consists of a series of discs or media blocks mounted on a shaft which is driven so that the media rotates at right angles to the flow of sewage. The discs or media blocks are normally made of plastic (polythene, PVC, expanded polystyrene) and are contained in a trough or tank so that about 40% of their area is immersed. The biological growth that becomes attached to the media assimilates the organic materials in the wastewater. Aeration is provided by the rotating action, which exposes the media to the air after contacting them with the wastewater.
The Principle of Moving Bed Bio Film Reactor (MBBR) Aerobic Reactor Anoxic Reactor
3 x MAXIS BRUNEI SEWAGE PLANT INSTALLATION INSTRUCTIONS
BIOREACTOR INSTALLATION • THE HIGH SPEED BIO-TEC REACTOR CONTAINERS REQUIRE PROPERLY LEVELLED GROUND PREFERELY A CONCRETE SLAB. • UPSTREAM AN AERATED WASTEWATER HOLDING TANK SHOULD BE PROVIDED. • DOWN STREAM A SLUDGE RECEIVING TANK SHOULD BE PROVIDED.
BIOMEDIA FILLING INSTRUCTIONS PREPARATION • CHECK THAT THE AIR HOLES IN THE SPARGER PIPES ARE FACING DOWNWARDS. • CHECK THAT THERE ARE NO OPENINGS OUTSIDE THE STRAINERS THAT THE BIOMEDIA CAN PASS THROUGH. • START THE AIR BLOWER AGAINST OPEN AIR VALVES AND THROTTLE GRADUALLY UNTIL THE DISCHARGE PRESSURE IS 0.4 BARG. REGULATE THE BLOWER SAFETY VALVE TO OPEN AT 0.4 BARG.
BIO MEDIA FILLING INSTRUCTIONS CONTINUED • FILL THE BIO REACTORS WITH WATER WHILE RUNNING THE AIR BLOWER WITH FULLY OPEN DIFFUSER VALVES AND CHECK THAT THE AIR DIFFUSERS ARE DELIVERING EQUAL AND UNIFORMLY DISTRIBUTED AMOUNT OF AIR FROM EACH DIFFUSER. • START AND RUN THE SLUDGE PUMP IN RECIRCULATION MODE FROM ALL DRAIN VALVES.
BIO MEDIA FILLING INSTRUCTIONS CONTINUED • START THE FEED PUMP WITH CLOSED DISCHARGE VALVE AND NOTE THE PUMP PRESSURE . OPEN THE DISCHARGE VALVE FULLY AND NOTE FULL FLOW AND DISCHARGE PRESSURE, • START THE CHEMICAL PUMP ON WATER AND CHECK CAPACITY.
BIO MEDIA FILLING INSTRUCTIONS CONTINUED • FILL REQUIRED BIOMEDIA AS PER THE QUANTITIES SPECIFIED IN TECHNICAL DATA IN THE FIRST TWO COMPARTMENTS. • CONTINUE AERATION UNTIL GOOD MIXING IS OBTAINED, MEANING VISIBLE MOVEMENT OF BIOMEDIA ON THE SURFACE. • GOOD MIXING IS NORMALLY OBTAINED AFTER 2 TO 3 DAYS.
STARTUP PROCEEDURE • START CHARGING BIOREACTORS WITH SEWAGE AT A FLOW RATE OF 100% OF RATED FLOW RATE. • SEWAGE CONTAINS SUFFICIENT DEGRADING BACTERIA TO DEVELOP A HEALTHY BIOCULTURE IN THE BIOREACTORS WITHOUT SEEDING. • RUN THE PLANT 2 DAYS IN RECIRCULATION AFTER WETTING. • THE pH WILL GO DOWN DURING ACIDIC STAGE AND THEN UP AGAIN AS THE DEGRADATION IS BEING COMPLETED.
STARTUP PROCEEDURE CONTINUED • WHEN pH IS BACK TO INITIAL VALUE, ADD MORE SEWAGE TO THE BUFFER TANK. • CONTINUE RECIRCULATION AND OBSERVE pH AGAIN. • REPEAT THE ABOVE PROCEEDURE ONE MORE TIME AFTER 2 DAYS. • IF THE pH RETURNS TO ITS ORIGINAL VALUE, THE PLANT CAN BE TAKEN UP FOR CONTINUOUS OPERATION.
BIOFILM GENERATION • TIME FOR GENERATION OF BIO FILM ON CARRIER ELEMENTS WILL VARY DEPENDING UPON TYPE OF WASTEWATER AND TEMPERATURE. • MUNICIPAL WASTEWATER 3 – 4 WEEKS • FOOD INDUSTRY 1 – 2 WEEKS • PAPER / PULP INDUSTRY 3 – 4 DAYS • AS TIME GOES BY, THE BIO FILM WILL DEVELOP AND BECOME MORE EFFICIENT AND ROBUST. IT WILL REACH ITS MAXIMUM CAPACITY AFTER ONE YEAR OF NORMAL OPERATION.
FOAM CONTROL • SEVERE FOAMING MAY BE ENCOUNTERED IN THE INITIAL PHASES OF TREATMENT DUE TO UNDER LOAD CONDITIONS BUT USUALLY THIS DISAPPEARS AFTER SOME WEEKS OF OPERATION. FOAM DOES NOT HINDER TREATMENT, IT IS A NUISANCE WHICH CAN BE CORRECTED THROUGH USE OF ANTI-FOAM CHEMICALS. OR BY SPRAYING FRESH WATER. • FOAMING IS CAUSED BY SURFACE TENSIONS IN THE WASTEWATER. FOAMING DURING STARTUP IS REDUCED BY REDUCING AERATION.
SHUT DOWN AND RESTART • If it becomes necessary to stop the load on the bioreactors for a shorter period, for instance one week, all reactors should be moderately aerated to keep aerobic bio media condition. • If it becomes necessary to stop the load on the bioreactors for a longer period, it is recommended to aerate the reactors the first week after the stop, and to restart aeration 2 days before the reactors are re-loaded with organic matter. • Before wastewater again can be pumped to the biological stage, it is important that all the bio media is in good suspension in all bioreactors first.
PLANT OPERATIONAL PROCEDURES Feeding • The plant comes with separate submerged feed pumps and level switches in order to facilitate selection of manual or automatic operation in the motor control console (MCC). • Adjust the capacity of the feed pump to slightly average hourly flow by throttling on the influent ball valve (BV.1). Read the flow in the flow meter. • Observe the flow over the effluent weir and adjust the position so that the uniform discharge is achieved over the weir. Observe also the visual quality of the effluent.