130 likes | 140 Views
History. f oundation of “ Oka-Polymer” industrial park Assembly line of cable plastics “ Ermafa ” has been launched
E N D
History foundationof “Oka-Polymer”industrial park Assembly line of cable plastics “Ermafa” has been launched The program concerning decomissioning of process units, buildings and structures, previously closed in 1980s and 1990s has been launched. 154 units, including 20 high-rise buildings have been dismantled within two years. 40,5 hectares of land in the central part of the plant and 54 hectares in the eastern have been cleaned in order to launch new investment projects Acquisition of Caprolaсtam plant by “SIBUR-Neftekhim”, OJSC Foundation of “Kapella” -- one of the first industrial joint ventures in Nizhny Novgorod region Caprolactam production closure “Caprolactam” chemical plant + start of caprolactam production Foundation of plant No96 (“Zavodstroy”) 2012 Foundationof “Oka-Polymer”industrial park 2012 2009 2007 2000 1994 1982 1966 1936
Supported by Nizhny Novgorod region’s government Excellent transport location 1 100 km Federal road M7Moscow-Ufa Gorky railway 500 m away from the Park 400 km International airport “Nizhny Novgorod” – 20 km away 370 km Center of river Volga navigationin Nizhny Novgorod
Supported by Nizhny Novgorod region’s government Excellent location of workforce 84 Mln of population Within 1000 km 43 Mln of population Within 500 km 3,28 Mln of population In Nizhny Novgorod region
Supported by Nizhny Novgorod region’s government Location – Dzerzhinsk,known as “the city of chemists” DZERZHINSK TODAY 1 2 3 Population –240 thousand people City’s economy is basedon industry Attractive investment climate: more than13,3 bln roubles have been invested in 2014 4 5 Scientific and technical background – graduates of numerous institutes of higher education – Nizhny Novgorod state University, Technical University, Architects University, numerous vocational educational establishments Located on the embankmentof navigable Oka river
Infrastructure Purpose-designed area, where locationof various chemically-oriented production is possible: OKA-POLYMER INDUSTRIAL PARK Chemical andpetro-chemical Car spareparts production Plasticgoods Metallurgyproduction 57,8% 12,5% 29,6% 300 350 thousandм2 Hectares Total territoryof the Industrial park Total area of buildingsand structures
Mapping of Oka-Polymerindustrial park As of today – 39 residents
Energy and engineering infrastructure Park’s resources Electricity280 megawatt Natural gas17 000 м3/hour Technical water25 000 м3/hour Waste Heat Industrial: 12 500 м3/hour Steam: 315 Gcal/hour Utility: 12 500 м3/hour Heated water: 50 Gcal/hour Auto transportationhard-surface road: 29 km Railway transportation“Promyshlennaya” station: 200 train cars/day
Services for park residents The services are divided into permanent and additional Permanent: Additional: Designservices Access control Security Territorylighting Roads maintenance Catering Territory maintenance: territory sweeping, snow removal, garbage removal Personnel transportation
Government support Governor’s ValeriyShantsevmeetingat “Oka-Polymer” industrial park
Government supportof investment activity 1 2 Provision of Nizhny Novgorod region state guarantees under investment projects (on competition basis) Organizational, informational (publicity), and legal support 3 4 Tax holiday for corporate property, created or acquired during project execution, for the organization which carries investment activity Lowered tax on income, received from project execution, and assignments to budget in the amount of 13,5% • From 100 till 500 mlnRUR —4 taxation periods • From 500 mlnRURand more —5 taxation periods • Under 100 mln RUR — 2 years • From 100 mln till 500 mlnRUR — 4 years • From 500 mln RURand more — 5 years
Key events:launch of production Thirty seven residents are located in the industrial park as of May, 2016. The amount of announced investments to launch new production capacities is more than 4,9 bln RUR. Our residents: OJSC“Sibur-Neftekhim” LLC“Boryszew Prlastic Rus” The object is being rented.Ethylene oxide, ethylene-glycole, acryl acids, and ethers production in Russia The object is owned.Car components production LLC“IntellektualnyeSistemy NN” LLC“Clarity” The object is owned.Polyethylene film production The object is owned.Electrooptics and solid-state lasers production
Yes or yes? Thank you for your attention!