An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCED Constraint Competitiveness Test (CCT) Update Review of (8/1/2013 to 10/8/2013) Market Analysis ERCOT

  2. Background of NPRR 520 (SCED CCT) • Why Change? • SCED over-mitigation issues • What Changed? • No Monthly and Daily Constraint Competitiveness Test (CCT) • SCED CCT runs every 5 minutes (or whenever SCED is executed) • Less set of Resources get mitigated • Minimizing unnecessary Base Point oscillations/QSGR dispatch CMWG

  3. System Lambda Increase (8/1-10/8) CMWG

  4. Mitigation Ratio CMWG

  5. Increased Peaker Net Margin (PNM) CMWG

  6. Pivotal Players For Each Active Constraint (8/1-10/8) CMWG

  7. Pivotal Players For Each Active Constraint (8/1-10/8) (continued) CMWG

  8. Top 10 Non-Competitive Constraints Based on Frequency (8/1-10/8) CMWG

  9. Top 10 Non-Competitive Constraints Based on Frequency (8/1-10/8) CMWG

  10. Top 10 Non-Competitive Constraints Based on Frequency (1) From Station: ODESA (138kV) To Station: ODNTH (138kV) Load Zone: LZ_WEST Weather Zone: WZ_FAR_WEST CMWG

  11. Top 10 Non-Competitive Constraints Based on Frequency (2) From Station: MGSES (1kV) To Station: MGSES (138kV) Load Zone: LZ_WEST Weather Zone: WZ_WEST CMWG

  12. Top 10 Non-Competitive Constraints Based on Frequency (3) From Station: CAGNON (1kV) To Station: CAGNON (138kV) Load Zone: LZ_SOUTH Weather Zone: WZ_SOUTH_CENTRAL CMWG

  13. Top 10 Non-Competitive Constraints Based on Frequency (4) From Station: SEGUIN (138kV) To Station: SEGUWE (138kV) Load Zone: LZ_SOUTH Weather Zone: WZ_SOUTH_CENTRAL CMWG

  14. Top 10 Non-Competitive Constraints Based on Frequency (5) From Station: ODEHV (138kV) To Station: BTHOT (138kV) Load Zone: LZ_WEST Weather Zone: WZ_FAR_WEST CMWG

  15. Top 10 Non-Competitive Constraints Based on Frequency (6) From Station: SNG (345kV) To Station: ZEN (345kV) Load Zone: LZ_HOUSTON Weather Zone: WZ_EAST/WZ_COAST CMWG

  16. Top 10 Non-Competitive Constraints Based on Frequency (7) From Station: TOKSW (345kV) To Station: JK_CK (345kV) Load Zone: LZ_NORTH Weather Zone: WZ_EAST CMWG

  17. Top 10 Non-Competitive Constraints Based on Frequency (8) From Station: JEWET (345kV) To Station: SNG (345kV) Load Zone: LZ_NORTH Weather Zone: WZ_EAST CMWG

  18. Top 10 Non-Competitive Constraints Based on Frequency (9) From Station: LION_HILL (69kV) To Station: SMITH (69kV) Load Zone: LZ_SOUTH Weather Zone: WZ_SOUTHERN CMWG

  19. Top 10 Non-Competitive Constraints Based on Frequency (10) From Station: CAGNON (345kV) To Station: CAGNON (1kV) Load Zone: LZ_SOUTH Weather Zone: WZ_SOUTH_CENTRAL CMWG

  20. Top 10 Non-Competitive Constraints Based on Congestion Impact (ShadowPrice*Limit*BindingHours) (8/1-10/8) CMWG

  21. Top 10 Non-Competitive Constraints Based on Congestion Impact(1) From Station: ODESA (138kV) To Station: ODNTH (138kV) Load Zone: LZ_WEST Weather Zone: WZ_FAR_WEST CMWG

  22. Top 10 Non-Competitive Constraints Based on Congestion Impact(2) From Station: ODEHV (138kV) To Station: BTHOT (138kV) Load Zone: LZ_WEST Weather Zone: WZ_FAR_WEST CMWG

  23. Top 10 Non-Competitive Constraints Based on Congestion Impact(3) From Station: SNG (345kV) To Station: ZEN (345kV) Load Zone: LZ_HOUSTON Weather Zone: WZ_EAST/WZ_COAST CMWG

  24. Top 10 Non-Competitive Constraints Based on Congestion Impact(4) From Station: CAGNON (1kV) To Station: CAGNON (138kV) Load Zone: LZ_SOUTH Weather Zone: WZ_SOUTH_CENTRAL CMWG

  25. Top 10 Non-Competitive Constraints Based on Congestion Impact(5) From Station: MGSES (1kV) To Station: MGSES (138kV) Load Zone: LZ_WEST Weather Zone: WZ_WEST CMWG

  26. Top 10 Non-Competitive Constraints Based on Congestion Impact(6) From Station: SNG (345kV) To Station: ZEN (345kV) Load Zone: LZ_HOUSTON Weather Zone: WZ_EAST/WZ_COAST CMWG

  27. Top 10 Non-Competitive Constraints Based on Congestion Impact(7) From Station: TOKSW (345kV) To Station: JK_CK (345kV) Load Zone: LZ_NORTH Weather Zone: WZ_EAST CMWG

  28. Top 10 Non-Competitive Constraints Based on Congestion Impact(8) From Station: CGRSW (138kV) To Station: BCKSW (138kV) Load Zone: LZ_WEST Weather Zone: WZ_EAST CMWG

  29. Top 10 Non-Competitive Constraints Based on Congestion Impact(9) From Station: LON_HILL (69kV) To Station: ROB_CPL (69kV) Load Zone: LZ_SOUTH Weather Zone: WZ_SOUTHERN CMWG

  30. Top 10 Non-Competitive Constraints Based on Congestion Impact(10) From Station: CNRSW (138kV) To Station: GRLRD (138kV) Load Zone: LZ_NORTH Weather Zone: WZ_NORTH_CENTRAL CMWG

  31. Constraints with Both Competitiveness Status (8/1-10/8) CMWG

  32. Summary of Impact of NPRR 520 CMWG