1 / 48

Mission Street Project Update Voyage 2070 Advance Operation Systems

This presentation discusses the implementation of Voyage 2070 - an Advanced Operation System using ASTRO Proactive Plan Selection to improve traffic signal control. The goals, steps, and results of the project are shared, along with observations and conclusions.

mnaomi
Download Presentation

Mission Street Project Update Voyage 2070 Advance Operation Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared By: Roger W. Boettcher ODOT Traffic Signal Control Specialist April 10, 2013

  2. Presentation Outline Existing conditions History Goals Project steps and installations Results and observations Conclusions

  3. Key Concept for ASTRO Functions SVO uses the same cycle length and offset for the guest plans as that of the hosts. This means no transitions and results in a smooth re-allocation of cycle time to serve higher demand phases! This is a very important concept to note. No transition means the system stays in coordination even while making “on the fly adjustments” Voyage ASTRO reviews the V+ko data every 4 minutes and can make a plans selection every 5 minutes.

  4. Existing Conditions Site History InboundAM Problem Intersections Problem intersection Problem intersection Critical Intersection OutboundPM

  5. Existing Conditions Site History Peak period travel times: 8 to 11 min. After installation of Voyage 2070 controllers travel times reduced to 4 to 4.5 minutes A reduction between 50-60%

  6. The Project Originally conceived as a proof of product test facility for NWS Voyage Advanced Features firmware and as a 2070 controller training grounds 7 new 2070 controllers since January 2010

  7. Goals Improve existing failed timing operations Resolve traffic flow issues at 3 major intersections: - 25th Avenue - Airport / Turner Road - Hawthorne Avenue

  8. Steps Step 1: replace 170 controllers and revise existing timing for 2070 operations Step 2: revise coordination offset reference to start of main street green Step 3: update Pedestrian and Red, Yellow clearance times to current standards

  9. Step 1 Steps 1 through 3 yielded nearly 20% improvement - increased through put volumes - Reduced travel time delays for entire system

  10. Step 2 Offset coordination reference points were adjusted to “Start of Main Street Green” These reductions are believed to be due to the inclusion of POM and the use of “Fast-way mode” for transition recovery

  11. Step 3 Revise Pedestrian & Red and Yellow Clearance Times to current standards The use of “Fast way” transition seeking in 2070’s avoids dwell and transitions quicker than the 170’s Minor revisions were made to the red, yellow and pedestrian transition times bringing them to current standards

  12. Step 4 Gather background Volume, occupancy, and MOE data Master System Detectors were determined for optimal flows

  13. Step 4 Require free flow for operations Part of local system detection at intersections Determine control thresholds for PPS, PPA and SVO operations

  14. Step 4 Free Flowing Volumes not easily found Three configurations were assessed The best fit

  15. Step 4 Best Fit Layout Two inbound master system detectors  Inbound flow Three outbound master system detectors Outbound flow Two inbound master system detectors

  16. Step 5 Generate basic ‘Host’ timing plans optimized using Synchro The plans library was populated with 16 ASTRO ‘host’ and ‘guest’ plans V+KO data resulted in appropriate TOD Operations

  17. Step 5 V+KO: flow rate over a detector, adjusted for occupancy Volume + (K * Occupancy)

  18. Step 5

  19. Step 5

  20. Step 6 Observe operations of host timing plans using standard TOD operations

  21. Step 6

  22. Step 7 Continue to collect background volume, occupancy and MOE data for analysis Capture fluctuations in the morning rush and make appropriate adjustments to the normal operational splits that the host plan is using The system responds nearly as quickly as the rise in the values and selects an appropriate plan Once the event passes the system makes a quick adjustment to the lower host plan and then to the low volume guest plan

  23. Step 7 AM Event @ 07:55 AM event captured and plan selection made by SVO operations

  24. Step 8 V+ko values for the morning operations have levels that will keep the system operational in host plan 8 until rise above host plan thresholds. Develop additional ‘Guest’ plans for SVO operations

  25. Step 9 Install and activate Guest plans (SVO & SVI) by TOD

  26. Step 9 SVO off/ PPA on TOD Free SVI on/ TOD Host P8 TOD Host P15 SVI off/ SVO on Host P12 TOD Host P5 Inbound Heavy Triad Plans 7, 8 and 9 Outbound Heavy Triad Plans 14, 15 and 16 P9 P6 P16 P8 P8 P5 P13 P15 P4 P7 P7 P12 P2 P14 P11 P1 Free

  27. Step 10 Master System Detectors 16 entries req’d. PPS not currently active PPA 2 entries required SVO 16 entries required Adjust activation thresholds for optimal operations

  28. Step 11 PPA allows extension of Plan coordination beyond TOD events and is operational on the shoulder times in the evenings and early morning after mid-night. 19:00 call to Free operations Free operations start here +/- Activate PPA operations for shoulder times of day

  29. Step 12 Adjust guest plan splits for optimal performance - Currently fully activated using PPA and SVA - PPA is working 24/7 on shoulder times in the evenings and mornings after mid-night

  30. Step 12 Track the areas of concern based on the data provided by Voyage MOE logs - Use these measures to determine the extent of improvement gained by the adjustments

  31. Step 12 Typical Monday on Mainline Mission Phase 2 (EB) no periods that could leave the phase early • MOE Graph (Before)

  32. Step 12 After PPA and SVO is operational we see a better use of the split times and a reduction in Mainline Max-out • MOE Graph (After)

  33. Step 12 After additional minor adjustments we see even better results • MOE Graph (After)

  34. Step 12 • MOE Graph (Before)

  35. Step 12 After additional minor adjustments we see even better results • MOE Graph (After)

  36. Step 12 The consequence of better service at a critical intersection may be seen • MOE Graph (Before)

  37. Step 12 We may see a bit of an increase in the delay at a less critical intersection that can absorb the additional queuing • MOE Graph (After)

  38. Step 13 Dynamic operations overlays to ASTRO features: - Auto-Max - Dynamic Phase Length - Dynamic Phase Reversal -Actuated Coordinated Operations - Coordinated Late Left Turn

  39. Step 14 Traffic Responsive TransSuite Equivalent to PPA Operations Data

  40. Conclusions Relatively easy process Very good results with any or all of these features PAA is probably the most useful out of the box feature SVO estimated 5 to 10 percent improvement for short term conditions Other features may be added as overlays These features may be installed with very little added cost to your systems

  41. Terms and Definitions Locations of Master System Detection is one of the primary steps to operations of Voyage Proactive Plan Selection and Split Variant Operations. This step is critical in the development and will require some sound judgment and observations for accurate results.

  42. Terms and Definitions Advanced Features – All traffic adaptive operations within Voyage. Dynamic Phase Length (DPL) Dynamic Phase Reversal (DPR) Auto Max Repeat Phase Service (RPS) Late Left Turn (LLT)

  43. Terms and Definitions Advanced Features – All traffic adaptive operations within Voyage. (cont.) ‘ASTRO’ Platoon Progression Proactive Plan Selection (PPS) Proactive Average Operation (PPA) Split Variant Operation (SVO)

  44. Terms and Definitions Split Variant In-bound (SVI) Split Variant Out-bound (SVO) Host or Base plans (5, 8, 12, and 15) Guest plans (4, 6, 7, 9, 11, 13, 14, and 16) Border Plans (3 and 10) Proactive Average Plans (0, 1 and 2) Ped. Override Mode (POM)

  45. Terms and DefinitionsPlans Library Guest Plans are located above and below Host plans as shown with 4,6,7,9,11,13,14, and 16 Host Plans are 5,8,12, and 15 Plans are grouped in Triads

  46. Terms and DefinitionsReference Proactive Average Plans 0, 1 and 2. Plan 0 = Free. Border Crossing Plans 3 and 10. V+Ko {volume + [K * % occupancy]} = {v+[40 * % occ]} = control threshold. V+Ko in-bound or out-bound.

  47. Terms and Definitions The base plans or ‘Host’ plans serve as just that, hosts to their respective clones or ‘Guest’ plans. Host plan 8 serves the morning heavy plan ‘Triad’ and has two ‘Guest’ plans. Plans 7 and 9 which are associated copies of the Host plan.

  48. Terms and Definitions SVO uses the same cycle length and off-set for the guest plans as that of the hosts. This means no transitions between plans and a smooth re-allocation of cycle time to serve higher demand phases!

More Related