Plymouth North High School Wind Turbine Project. Model High School Site 41 Obery Street Plymouth, MA. Project History. Atlantic Design Engineers, LLC (Atlantic) conducted an initial wind turbine siting and feasibility analysis of the PNHS property.
E N D
Plymouth North High School Wind Turbine Project Model High School Site 41 Obery Street Plymouth, MA
Project History • Atlantic Design Engineers, LLC (Atlantic) conducted an initial wind turbine siting and feasibility analysis of the PNHS property. • Atlantic completed a series of studies to obtain a better understanding of the impacts associated with a turbine in this location including: • Shadow Flicker Impact Study • Photosimulations from various locations around the site • Zone of Visual Influence (ZVI) Map • Atlantic then completed a noise monitoring program and Acoustic Analysis to determine the background (ambient) noise levels at various locations surrounding the site; and selected a representative turbine (900kW EWT) to acquire a better understanding of the specific acoustic impacts the project may have on nearby residential neighborhoods.
Energy Production Estimates Energy production numbers are based on the following: • Predicted Wind Resource: • 5.4 m/s at 40 m (131’) AGL • 5.7 m/s at 55 m (180’) AGL • 6.4 m/s at 75 m (246’) AGL • Annual energy production loss factor of 8% • 75 m EWT 54-900: 900 kW Rated Capacity: 2,124,000 kWh/year* • 71 m Gamesa G58: 850 kW Rated Capacity: 2,117,000 kWh/year • 55 m Aeronautica 54-750: 750 kW Rated Capacity: 1,604,000 kWh/year • 40 m Aeronautica 29-225: 225 kW Rated Capacity: 313,000 kWh/year *: Model used to complete Shadow Flicker, Visual, and Noise Impact Assessments