1 / 14

TOD Parking Utilization

TOD Parking Utilization. SJSU/VTA Collaborative research Project Santa Clara County Justin Meek, AICP | November 9, 2012. Project Objectives. Survey utilization at TOD residential projects Corroborate findings of other research on the topic (e.g., Cervero et al, 2009)

moe
Download Presentation

TOD Parking Utilization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOD Parking Utilization SJSU/VTA Collaborative research Project Santa Clara County Justin Meek, AICP | November 9, 2012

  2. Project Objectives • Survey utilization at TOD residential projects • Corroborate findings of other research on the topic (e.g., Cervero et al, 2009) • Provide localdata for the South Bay • Provide relevant information for similar projects throughout the U.S. • Evidence that reduced parking standards may be permissible

  3. SJSU/VTA Study Area

  4. Criteria Within ½ mile of a transit station Minimum residential occupancy of 85% Over one year old Free parking Restricted/designated parking Open surface parking or podium garage(i.e., no townhomes/developments with private garages) At least 80 units or 100 parking spaces

  5. Methodology • 12 survey sites • Nearby transit stations • VTA Light rail: Mtn. View, Fair Oaks, Tasman, River Oaks, St. James, Santa Clara, San Antonio, Race, Tamien, Ohlone-Chynoweth, and Almaden • Caltrain: Mountain View and Santa Clara • Conducted mid-week (Tuesday – Thursday) • Surveyed peak period (between 12 and 4 a.m.)

  6. Downtown San José and Tasman Stations

  7. Survey Data

  8. Key Findings • Parking Utilization • 2,496out of 9,751 spaces were unused (26%)

  9. Key Findings • Parking Utilization • Utilization ranged from 61% to 83% Parking Demand

  10. Key Findings • Parking Utilization • 2,496 out of 9,751 spaces were unused (26%) • Utilization ranged from 61% to 83% • Parking Supply • 1.7 spaces per dwelling unit provided • Parking Demand • Only1.3spaces per dwelling unit needed • Comparison to local requirements • Demand rates near the bottom or below parking requirements • Suggests that TOD residential properties near rail stations in Santa Clara County are “over-parked”

  11. Parking Demand < Zoning Requirements Utilized Parking Spaces/Occupied Housing Units

  12. East Bay Parking Demand Rates • Average - 25% over supply Source: Are TODs Over-Parked (Cervero, Adkins and Sullivan 2009)

  13. Cost of Unutilized Spaces • Capital costs $37.4 million* • Maintenance and operation $2 million per year* * $15,000 per space * 2,496 spaces = $37.4 million * $800 per year per space * 2,496 spaces = $2 million

  14. Resources • Report title: A Parking Utilization Survey for Transit-Oriented Development Residential Properties • SJSU, Urban & Regional Planning website www.sjsu.edu/urbanplanning/communityplanning/ • Report www.sjsu.edu/urbanplanning/docs/VTA-TODParkingSurveyReport-VolI.pdf • Report Appendices www.sjsu.edu/urbanplanning/docs/VTA-TODParkingSurveyReport-Vol2.pdf • Report Summary (8 pages) www.sjsu.edu/urbanplanning/docs/VTA-TOD_ParkingSurveySummary.pdf