1 / 42

Coastal Management Division Online Permitting

Coastal Management Division Online Permitting. www.dnr.louisiana.gov. System Generated User Accounts. If an email address is provided in step 1 or 2, and a user account that contains that email address does not exist, an account is created automatically using the email address provided

moesha
Download Presentation

Coastal Management Division Online Permitting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coastal Management DivisionOnline Permitting

  2. www.dnr.louisiana.gov

  3. System Generated User Accounts If an email address is provided in step 1 or 2, and a user account that contains that email address does not exist, an account is created automatically using the email address provided EX: user ID: christinec@dnr.state.la.us password: christinec@dnr.state.la.us1 An applicant that did not create a user account can use this log in information to view/modify applications filed by a third party

  4. Necessary Information – Application Form • Applicant/Agent information • Landowner/Adjacent Landowner names and mailing addresses (attach additional sheet(s) if necessary) • Lat/Long of Project (attach additional sheet(s) if more than one point) • Excavation/Fill Volumes and Types of Materials (native material, sand bags, etc.) • Equipment Used (marsh buggy, shallow draft vessels, pipe lay barge, etc.)

  5. Necessary Information - Plats • POB, POE and all Points of Infection • Length and Diameter of Pipeline • Method of Installation (trench, push/pull on surface, directionally bore, etc.) • Depth of Installation • Pipeline Crossing and Tie-in Details (larger excavation area, bracing details and materials used, etc), Bore entry/exit location and size of required workspaces • Access Route, Water Depth, Vessel Draft

  6. For questions and/or system problems, please contact: Christine Charrier christine.charrier@la.gov Ph: (225) 342-7953 (800) 267-4019 Fax: (225) 342-9439

  7. 1-225-342-7591 1-800-267-4019 www.dnr.louisiana.gov

More Related