60 likes | 182 Views
Theater Opening Task Organization. X X. X. ESG-2. CJTF Saber Strike 2012. BALTOPS. X. X. FCP. MPF Off-load. Combined Movements Center. Theater Opening Syndicate. Syndicate leaders – LTC Looney / MAJ Toompalu / Responsibilities :. Provide input to the exercise plan
E N D
Theater Opening Task Organization X X X ESG-2 CJTF Saber Strike 2012 BALTOPS X X FCP MPF Off-load Combined Movements Center
Theater Opening Syndicate Syndicate leaders – LTC Looney / MAJ Toompalu / Responsibilities: • Provide input to the exercise plan • Determine movement costs for exercise execution • Draft transportation and movement concept • Draft manning document to support theater opening • Draft theater opening specific life support requirements • Develop base operations plan for theater opening exercise locations • Draft command and control structure for Theater Opening Joint Task Force • Draft a synchronized Procurement Strategy with NAVEUR/MARFOREUR contracting assets • Develop initial equipment listing • Determine mode/source of exercise cargo based on available budget and timeline • Publish initial timeline for decision points and requirements submission • Confirm TO specific site survey requirements and timeline
Area of Operations 50 KM Area of Operations 97 KM 145 KM BALTOPS MPF Offload USAF (A-10,KC-135, CRE) 280 KM 297 KM 236 KM • CJTF/EXCON Theater Opening Exercise CPX FTX
ITV Laydown R R R Radio Frequency Identification US Army R USMC R R SPOD? R USAF R VISTARS Satellite Tracker US Rail Moves? Estonian Convoy Lithuanian Convoy NTVs (EST-LVA) R R
Theater Opening/RSOMCommon Operating Picture CENTRALIZED • Preferred COA • All countries provide Liaison to central cell • ITV feed received via BCS3 • ITV crossover to LOGFAS • Common Operating Picture managed on BCS3 & LOGFAS DISTRIBUTED • US provides Liaison to National Movements Centers • ITV feed received via BCS3 • Common Operating Picture managed and shared on BCS3
Consequence ManagementCommand Post Exercise • Planning exercise between 21TSC JTF TORCH, Estonian MOI, HNSC and US Embassy • Conducted during 11-22 JUN exercise window • Crisis event similar to EU CREMEX • Torch party arrives to coordinate US assistance with MOI under US Embassy guidance • Deployment of US response coordinated with HNSC • CPX (JDLM Simulation) execution of deployment Currently Pending USEUCOM approval during 19 SEP FCM VTC and Estonian participation decision.