100 likes | 276 Views
2. Project Background. Transnet Rail Engineering (TRE) appointed USK Consulting to conduct a scientific soil analysis to confirm the extent and severity of asbestos and heavy metal pollution at Koedoespoort station.The aims and objectives of the assignment include: To undertake soil analysis to Id
E N D