IPC Conformal Coating Material & Application “State of the Industry” Assessment Project. Dave Hillman, Tina Berthiaume Rockwell Collins IPC/SMTA Cleaning & Coating Conference. Agenda. Background IPC Committee Task Plan Test Materials Test Vehicle Metallographic S ectioning Plan
E N D
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Dave Hillman, Tina Berthiaume Rockwell Collins IPC/SMTA Cleaning & Coating Conference
Agenda • Background • IPC Committee Task Plan • Test Materials • Test Vehicle • Metallographic Sectioning Plan • Conformal Coating Measurements • Anticipated Results
Background Graphic Courtesy of CALCE Consortia
Background Graphic Courtesy of CALCE Consortia
Background Graphic Courtesy of CALCE Consortia
Background Graphic Courtesy of CALCE Consortia
Background Graphic Courtesy of PERM group
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project IPC-JSTD-001E Subcommittee Task Team: Conformal Coating Material & Application “State of the Industry” Assessment The goal of the project is to document the current “State of the Industry” of conformal coating application on printed wiring assemblies. The project will look at the major conformal coating types (i.e. AR, ER, UR, SR, XY) and method of application (i.e. spray, dip, brush). The project will not evaluate individual companies or specific conformal coating products – plan is to do a “blind” task activity. Study will produce baseline data on what thickness/coverage the industry is/can achieve with conformal coating materials.
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project • Conformal Coating Types: • AR = acrylic • ER = epoxy • UR = urethane • SR = silicone • XY = paralyene • Application Method: • Machine or Manual • Spray • Dip • Brush • Other • Application Volunteers to collect and retain detailed documentation of application method –NO IP will be disclosed. Sufficient baseline application process details have been disclosed for every application method. Test Vehicle
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project • Current Status: • Task Group coating/application tasks complete: • ~12 volunteer conformal coating facilities utilized • ~ 95 individual test vehicles processed • 5 Conformal Coating materials covered (AR, ER, UR, SR, XY) • Task Group application methodologies covered: • Manual Spray • Automated Spray (stream) • Automated Spray (atomized) • Dipped • Brushed • Vapor Deposition (on XY only) • Committee Results Review at APEX Conference and IPC Committee meeting at SMTA Fall Conference • Task Group Final Report “Roughly” Scheduled for 2015
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project • Project “Statistics” • Application Method: • Manual Spray: AR = 1, UR = 3, SR=3 • Automated Spray: AR = 4, UR = 6, SR = 3, ER = 2 • Vapor Deposited: XY = 1 • Dip Deposition: AR =1 • Manual Brush: AR=1 • Manual Syringe/Automated Spray: AR =1 • Cure Method: • Thermal • UV • Air/Thermal/UV combinations • General: • 3 Different Automated Spray Systems, Multiple Spray Angle/Pass Combinations
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project • Coating Coverage and Thickness Assessment Method: Metallographic Cross-sectioning • Details: • Will gold sputter to define conformal coating outer edge before potting • Will “cap coat” gold layer for metallographic section purposes • Will cross-section from two angles • Straight On • Profile • Lots of Photographs with general assessment before cross-section (photos, flat thickness measurement) • Task Group Metallographic Process Document Available on IPC Kavi Site
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Components Being Assessed: 25 per TV and 3 TV per Coating/Application Set
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Processing: Photodocumentation
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Processing: Photodocumentation
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Processing: Photodocumentation
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Processing: Photodocumentation
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Careful Removal From Test Vehicle (Gold Sputtering/Protective Cap Layer)
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Metallographic Cross-sectioning: Cold Mount, Off Angle Grind/Polish
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Measurements: Standards Calibrated Metallographic Scope
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project
JSTD-001Conformal Coating Material & Application Industry Assessment
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Measurements: Maximum, Minimum, and Top of Component Examples
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Application Detail Material: UR Application Process: Asymtek C740 equipment, SC300 atomizing head, 0.26 mm nozzle, 10 Degree flute, 10 psi fluid pressure, 30 psi atomizing pressure, 4 passes per path direction procedure
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Application Detail Material: SR Application Process: Manually Sprayed with Binks Model 2001 conventional gun at angle (approximately 45 degree) with applications at every 90 degrees (the boards are rotated to receive the angle spray from 4 sides to prevent shadowing).
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project Application Detail Material:ER Application Process: Atomized Spray Coating, 10 passes each in X & Y axis, IR Profile followed by Batch Cure 45 min, 1 - 3 mils
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project
IPC Conformal Coating Material & Application “State of the Industry” Assessment Project • Multiple Opportunities for Comparison • Application Method: • Manual Spray: AR = 1, UR = 3, SR=3 • Automated Spray: AR = 4, UR = 6, SR = 3, ER = 2 • Vapor Deposited: XY = 1 • Dip Deposition: AR =1 • Manual Brush: AR = 1 • Manual Syringe/Automated Spray: AR =1 • Final Report anticipated to address thin coating areas and potentially “critical coating” areas similar to “critical solderability” areas