An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Enrollment Growth Meetings February 2012 Superintendent Mark Dockins

  2. Presentation Purposes • Why the need for a change? • What are some proposed solutions? • How much will the proposed solutions cost? • When can the proposed plans be operational?

  3. What is prompting this need for a change?

  4. Explosive Enrollment Growth • Uintah was the fastest growing school district in the state last year at 4.6%. • Uintah continues to show enrollment growth even while other counties and states are in economic decline. • Our senior class this year has 391 students which started with 451 Kindergarten students. • This year our Kindergarten class has 726 students. • Our Kindergarten class for next year is projected to be 785.

  5. 2006-2012 Enrollment History

  6. What are some proposed solutions?

  7. Four Possible Solutions • Adopt a Year-Round School Schedule • Build additions onto Vernal Middle and Vernal Junior High Schools to increase capacities • Bond to build a new high school, move 9th graders up to the high school level and change the configuration at VJH/VMS • Complete Current 10 year plan with an addition at UHS to accommodate 9th graders and change the configuration at VJH/VMS

  8. Year-Round Schooling • More efficient use of building • Research suggests it benefits At-Risk students • On-going costs:1M • Logistics of Scheduling

  9. Additions at VJH/VMS • Cost is not within scope of 10 year plan • Both schools have already been remodeled recently • How large do we want a middle school or junior high? • Auditoriums, cafeterias, hallways, safety, space for addition at VJH?

  10. New Configuration with High School • K-5 Elementary schools • Two 6,7,8 middle/junior high school • Grades 9-12 high school

  11. What Supports the Configuration of moving 9th Grade to High School? • Enrollment growth • Curriculum and activity needs match better with a 6/7/8 school vs 8/9 school • 9th grade credit/counseling • Academic interventions • More efficient use of personnel and resources with 9th grade at high school: • Performing Arts • CTE/ATC/Concurrent Ed

  12. UHS: Last School in Ten Year Plan • The scope of the ten year plan for the bond was to remodel UHS. • Within the scope of the remodel there are issues with stadium, cafeteria, auditorium and all mechanicals. • This is planned to be a two year project and is anticipated to be in the 20M range. • An addition to handle capacity could be accomplished without raising taxes. • Fiscal Responsibility

  13. A New High School • Smaller high school atmosphere • More opportunities for students to participate in certain activities • How large do we want Uintah High School to be? • Cost: • Expense of building and purchase of property • Expense of operating a new high school: duplication of everything a high school needs • Double the travel and expenses for extra-curricular/routes • Lose identity of a single high school community

  14. Cost of Proposals • Year-round School: 1M increase in operational costs • Additions to VJH/VMS: • 4.5 M • Reconfiguration with New High School • Bond (50 to 60 M) • Property • Building • Leeway (6M) • Maintenance and Operations • Reconfiguration with UHS Expansion (3.5 M to add classroom capacity) • UHS is last school on the ten year facilities plan and we can handle the cost of the remodel without bonding and raising taxes • Can be accomplished within the scope of the current ten year plan and funding

  15. When will the proposed changes be implemented? • Year-round School: 2013-14 • VMS/VJH Additions: 2014-15 • UHS Addition: 2014-15 • New High School: 2015-16

  16. Thank you for your attendance. We appreciate your interest in what we are trying to accomplish.