BALEROS, BANDAS Y TORNILLOS SA DE CV

BALEROS, BANDAS Y TORNILLOS SA DE CV. PLAN DE TRABAJO ETAPA 5: IMPLEMENTACION EN PRACTICA ( EQUIPOS DE TRABAJO) ISO-9001:2008. PROYECTO SISTEMA DE ADMINISTRACION DE CALIDAD ISO-9001:2008. CONTENIDO. Metodología de Trabajo a seguir. Cronograma de Trabajo General para todo el proyecto.

monte
Download Presentation

BALEROS, BANDAS Y TORNILLOS SA DE CV

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BALEROS, BANDAS Y TORNILLOS SA DE CV PLAN DE TRABAJO ETAPA 5: IMPLEMENTACION EN PRACTICA ( EQUIPOS DE TRABAJO) ISO-9001:2008 PROYECTO SISTEMA DE ADMINISTRACION DE CALIDAD ISO-9001:2008

  2. CONTENIDO • Metodología de Trabajo a seguir. • Cronograma de Trabajo General para todo el proyecto. • Generales.

  3. METODOLOGÍA DE TRABAJO A SEGUIR El proyecto de implementación del Sistema tiene una duración de 24 semanas GLOBALES, las cuáles se dividen en 6 etapas: 1 CAPACITACIÓN TECNICA GENERAL 2 INDICADORES DE DESEMPEÑO FORMACION Y CAPACITACION EN ISO-9001:2008 3 DESARROLLO Y ACTUALIZACION DE DOCUMENTACIÓN Y REGISTROS 4 5 IMPLEMENTACIÓN Y VALIDACIÓN OPERATIVA 6 MEDICIÓN POR AUDITORIAS

  4. IMPLEMENTACION EN PRACTICA POR EQUIPOS DE TRABAJO