LBT Q1 2009 Eng/SW Review

PWR: Site electrical power. LBT Q1 2009 Eng/SW Review. Highlights (Q1/2009). MGIO power situation with reactors on the 25kV supply line Completed LGS power estimate, purchase 2010, costs will increase. Open Issues. Technical

morag
Download Presentation

LBT Q1 2009 Eng/SW Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PWR: Site electrical power LBT Q1 2009 Eng/SW Review

  2. Highlights (Q1/2009) MGIO power situation with reactors on the 25kV supply line Completed LGS power estimate, purchase 2010, costs will increase

  3. Open Issues Technical UPS replacement on level 1, waiting for max load estimate to size UPS Schedule Finish installation of UPS power to MCS, requires shut down Finish installation of UPS power to HBS and HBS RIO cabinets Install UPS power to PEPSI bridge Financial New UPS?? Resource None

  4. Planning (Q2/2009) Determine where UPS power for PEPSI at bridge location comes from Continue monitoring power quality Finish installation of UPS power to MCS, requires shut down Finish installation of UPS power to HBS and HBS RIO cabinets