PWR: Site electrical power LBT Q1 2009 Eng/SW Review
Highlights (Q1/2009) MGIO power situation with reactors on the 25kV supply line Completed LGS power estimate, purchase 2010, costs will increase
Open Issues Technical UPS replacement on level 1, waiting for max load estimate to size UPS Schedule Finish installation of UPS power to MCS, requires shut down Finish installation of UPS power to HBS and HBS RIO cabinets Install UPS power to PEPSI bridge Financial New UPS?? Resource None
Planning (Q2/2009) Determine where UPS power for PEPSI at bridge location comes from Continue monitoring power quality Finish installation of UPS power to MCS, requires shut down Finish installation of UPS power to HBS and HBS RIO cabinets