Construction Noise Control « Noise Control Ordinance » (Chapter 400)

Construction Noise Control « Noise Control Ordinance » (Chapter 400). Form 4 Noise Control Ordinance (Chapter 400) Construction Noise Permit Application. Content. «Noise Control Ordinance» Product noise control Construction noise control Construction noise permit application

moral
Download Presentation

Construction Noise Control « Noise Control Ordinance » (Chapter 400)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Noise Control« Noise Control Ordinance »(Chapter 400)

  2. Form 4 Noise Control Ordinance (Chapter 400) Construction Noise Permit Application Content • «Noise Control Ordinance» • Product noise control • Construction noise control • Construction noise permit application • Enforcement practices

  3. Neighbourhood noise • Industrial / commercial noise • Product noise control • Construction noise «Noise Control Ordinance» • Neighbourhood noise • Industrial / commercial noise

  4. Product Noise Control • To phase out noisy products

  5. ‘Prescribed’ products for control: • Air compressors • Hand held breakers • is required for their use Product Noise Control • To phase out noisy products Green Label

  6. Construction Noise Control • Percussive Piling • General Works

  7. The Construction Noise Permit (CNP) System

  8. Percussive Piling Control • 0700-1900 hours on non-holidays • CNP Required • Banned during other times

  9. Percussive Piling CNP «Technical Memorandum for CNP assessment» • Refuse or issue CNP for 3, 5 or 12-hour • Piling hours to suit schools & exams

  10. Percussive Piling CNP • Tightened controls on noisy hammers (e.g. : Diesel piling hammer) • CNP for noisy hammers would be refused (Provision for special cases)

  11. PME (Powered Mechanical Equipment) • General control for the whole territory SPME (Specified Powered Mechanical Equipment) PCW (Prescribed Construction Work) • Stricter requirement within designated areas (e.g. major housing estates) General Works

  12. Specified Powered Mechanical Equipment General Works • Hand-held percussive breaker • Bulldozer

  13. Specified Powered Mechanical Equipment General Works • Concrete lorry mixer • Dump truck • Vibratory poker

  14. Prescribed Construction Work (PCW) General Works • Erection / dismantling of formwork / scaffolding • Loading / unloading / handling of rubble, wooden boards, steel bars wood or scaffolding material • Hammering

  15. Quiet Method of Prescribed Construction Work General Works • Disposal of rubble through plastic chutes

  16. CNP Assessment Technical memoranda for assessment General Works • Assess noise impact on nearby Noise Sensitive Receivers • Correction for multi- sites • Complaints / legal actions are taken into consideration

  17. Construction Noise Control Philosophy • Daytime - no CNP control on GW • Nighttime - people have the right of peace for rest • No CNP granted unless really necessary

  18. CNP Applications • Fully utilize the less noise sensitive hours • Apply only if really necessary • Self - assess before applying • Apply well in advance • Provide relevant information

  19. CNP Assessment • Meeting noise requirements • No prohibited activities • Unavoidable constraints on working hours • Justification required • Quietest means + Practical noise mitigation measures

  20. Quiet Construction Work • Use Quieter Equipment Modern wire saw for concrete cutting 16 dB(A) lower than excavator mounted breaker

  21. Hydraulic piling hammerreduce 2-9 dB(A) Hydraulic crusher for demolition 20 dB(A) lower than excavator mounted breaker Quiet Construction Work • Use Quieter Equipment

  22. Enclosure effectively reduced noise from generator Acoustic enclosure for breaker reduce 3-5 dB(A) 6m barrier for pre-bored machines reduce 3 dB(A) Quiet Construction Work • Use Quieter Equipment • Enclosure / Barriers

  23. Specific design noise enclosure Container used as noise enclosure Quiet Construction Work • Use QuieterEquipment • Enclosure / Barriers

  24. Good communication with affected neighbors reduce complaint Control of the flow of people during holiday Communication with Neighbours

  25. Enforcement Practices • EPD / Police will take action if : • use of prescribed products without the • no valid CNP for work when necessary • CNP conditions are not complied with Green Label

  26. Enforcement Practices • Police would: • possess copies of issued CNP • investigate complaints • initiate prosecution

  27. Enforcement Practices • EPD would : • relay complaints to Police • investigate complaints • conduct surveillance inspection • initiate prosecution

  28. Enforcement Practices • Offences spotted would : • result in cancellation of CNPs • have an effect on CNP renewals • lead to prosecution action

  29. Enforcement Practices • Main contractors are strictly liable • Any persons involved are also liable: • sub-contractors • person-in-charge • workers • managing directors

  30. Enforcement Practices • Fine : • $100,000 on first conviction • $200,000 on 2nd or subsequent convictions • daily fine $20,000 per day. • Conviction records would be : • Relayed to Client Government Departments / bureaux • Released to the press

  31. Summary • Noise Control Ordinance • CNP for -Percussive Piling -General Works • Green Label for -Air compressors -Hand-held breaker Green Label

  32. Summary • Allow no work at night time & on holidays without a CNP • Monitoring / control site activities - own work / subcontractors • Rectify irregularities promptly • Educate staff / provide training • Minimize disturbances • Prevention is better than cure

  33. Environmental Protection Department