1 / 29

How LRT affect Kayseri

How LRT affect Kayseri. Feyzullah GUNDOGDU Kayseri Light Rail System Fixed Installation Manager e-mail: feygun @ kayseriulasim .com. INDEX. Kayseri Kayseri Light Rail System Actions Taken Impacts on City. Info about Kayseri. 6000 years in history Populations : 1,300,000

moral
Download Presentation

How LRT affect Kayseri

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How LRT affect Kayseri Feyzullah GUNDOGDU Kayseri LightRailSystem FixedInstallationManager e-mail: feygun@kayseriulasim.com

  2. INDEX • Kayseri • Kayseri LightRailSystem • ActionsTaken • Impacts on City

  3. Infoabout Kayseri • 6000 years in history • Populations: 1,300,000 • Increase rate ~ 9% (2007-2012) • SurfaceArea 17.000 km2 • Over 1,000 producitoncenter • Over 100,000 Employment • 4 University, • 30,000 Universitystudent • 8 industrialzone • BiggestFreezone of Turkey • 5 billion $ output • 1,2 billion $ exports • Morethan 5,000 production

  4. Transport • Transport one of the major problem of cities, • Planning Transportation takes long time and never ends, • Affects characteristic of the city,

  5. Milestones • 1999 Transportationplaningand LRT feasibilityprojecttendered, • 2001 Transportationstudyapprovedbyministry of transport, • 2004 LRT projecttendered, • 2006 ConstructionStarted, • 2009 Kayseri LRT startedoperations, • 2011 Phase II and III tendered,

  6. Results of Study

  7. LRT line

  8. Characteristics of The Kayseray • KayserayCharacteristics • Rail Route Length : 17,39 km • Depot Track Length: 4,200 m • Number of Vehicles :38 • Number of Stations : 28 • Distance btw. Stations : 400-800m • Min. Headway : 4 min. • Trip Time : 42,0 min • Station Length : 65 m • Construction Works : 1095 day • Vehicle Capacity : 276 p

  9. Actionstakenwith LRT • Replacingdiesel mini buswith 12 m CNG Bus. • Therewas 400 minibus, 200 CNC BUS put into service.

  10. Actionstakenwith LRT • Bikesharingsystemestablished. • %15 of bikeusersalsousesmass transit, • 5,500 users, 1.500 timesbikeused in a day.

  11. Actionstakenwith LRT • EntegrationwithBuslines. • ParallelBuslinesorganized in a waythattheyfeeds LRT.

  12. Actionstakenwith LRT • Integrated Fare collectionsystemestablished. • Singleticketusesforall transport modes, bus, lrt, bikeandforturism.

  13. Actionstakenwith LRT • Extentiosplanned.

  14. Actionstakenwith LRT Greentracksystemimplemented. In the line we have • 116.000 m2 green grass • 10,000 tree, beside thetrack • 200,000 small plants

  15. Impacts • Increased passengers in the public transport • 30 % of our passengers have possibility to travel with their own car BUT they prefer Public Transport,

  16. Impacts • Land usage increased along the rail corridor, • New residental areas, 3 shopping centreopened,

  17. Impacts • New statidumcostructedalongrailwaycorridor, • Land of Formersoldandfinanceusedforprojects.

  18. Impacts • New coachstationsconstructedalongrailcorridor. • Land of oldonesoldandfinanceusedforprojects.

  19. Impacts • Property value are increased by 30 percent along rail corridor,

  20. Impacts • Environmentallyfiriendly CNG bushelp us tosave 25 percent CO2 emissions.

  21. Impacts EconomicalEffect: • 15 mio Euro recordedandtaxed. Formerlydriverwerecollectingmany.

  22. Impacts Fare Collection • Ticketingoperationstenderedtoprivatecompany • Saving 2 mio Euro peryear.

  23. Impacts • Anadolu AmusementCenter: 40.000 visitorduringweekend

  24. Impacts • AirPollution It is wellknownthat 1,5m2 greengrassproducesoxigenneedsforonehuman in oneday. Thismeansthat in total greengrass of Kayseri LightRailSystemproducesoxigen of the 68,000 human in oneday.

  25. Impacts Additiontothis: 1 m2 greengrassequalto 100 m2 leafarea. Thismeansthatdepending on wind 0,2-2kg/m2 dust can be absorbedbygreengrass. Thesetwoparametersshowsthepositiveeffect of greentrack on environment.

  26. Impacts Effect on Passengers Natureplaystwopassive role in thecomfort of thepeoples. One: feelingandwatchingthenature, Others: knowingtheexixstence of thenatureeven not seenbythem.

  27. Extentions

  28. Thank YouVeryMuch

More Related