An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Process Patterns in BizAGI

  2. Overview • Types of events • Types of gateways • Design patterns • list

  3. Events • Fire as a result of something happening • A message is received • A period of time elapses • An exceptional conditional arises • We typically perform an action in response to an event

  4. Event Types • Message – Arrives from a participant • Timer – Process starts at a period in time • Rule (conditional)– Triggers when a rule becomes true

  5. Event Types (2) • Link – Connect the end event of one process to the start of another process • Multiple – Multiple ways of triggering the process • Exception – An error • End events

  6. Message Events • Messages are typically sent by one participant and received by another • Send sales order information that is received by accounting to check credit • The event can be thrown or caught • Sending a message means throwing a message • Receiving a message means catching a message • See MessageThrowCatch in EventSamples

  7. Message Throw Catch Example

  8. Timer Events • The event fires a specific time or cycle • Only applicable to start or intermediate events • In BizAgi, use the Element properties to set the timer to a date or cycle • Examples • Time delay to approve credit • Wait for payment date • Start payroll process every two weeks • See Timer in EventSamples

  9. Conditional Events • Events that fire when an external condition becomes true or false • Process A/P checks on Mondays • We could also implement this as a timer • Inventory below threshold – generate order request • Only applicable to start or intermediate events • See Conditional in EventSamples

  10. Gateways 1 • Gateways are used to depict decisions or merges • Types • Exclusive (XOR) • Only one output (alternative) flow is allowed • Gateways diverge or converge • Inclusive (OR) • A default output flow must be specified • Parallel for / join (AND)

  11. Gateways (2) • Event-based gateways • These are (Exclusive) gateways that rely on external messages

  12. Gateway – XOR Example • Exclusive XOR Decision • See ExclusiveGatewayin EventSamples

  13. Gateway - OR • Inclusive OR decision

  14. Gateway – Example 3 • Parallel Forking – All sequence flows drawn out of the gateway are taken

  15. Processes and Tasks • A process is a network of steps • A process can be marked as having a sub-process • To mark an activity has having a sub process, right-click the activity and click Transform to subprocess

  16. Sub Processes – Illustration (1)

  17. Data Objects • First, we are not talking about a database or physical data • We are talking about information about a process • Data objects are attached to a sequence or message flow with a dashed line

  18. Data Objects (Illustration)

  19. Text Annotation • Contains descriptive text about a process • A line connects the annotation to the activity

  20. Workflow Patterns (Introduction) • In this second section of the lecture, we talk about simple and complex workflow patterns • Much of this is derived from the AIFB paper (Modeling Workflow Patterns) in this lecture

  21. Sequence Pattern • Tasks are executed in sequence (one after another)

  22. Parallel Split • This is a logical AND gateway • The parallel branches are executed concurrently

  23. Parallel Split (Example)

  24. Synchronization • Two or more different branches get merged into a single branch • All merged branches must be completed before the process can continue (Implied) • Synchronization can occur because of a parallel split

  25. Synchronization (Illustration)

  26. Exclusive Choice • Here, we are making a decision with mutually exclusive outcomes • (Only one outcome is possible)

  27. Exclusive Choice (Example)

  28. Simple Merge • A point in a process where two or more branches are merged into a single branch • The initial branches are created via some type of choice

  29. Simple Merge (Example)