Study Results Common Case Study. This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case. This study serves as a base case for all 2011 and 2012 studies. 2022 PC1 – Common Case.

moriah
Download Presentation

Study Results Common Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Study ResultsCommon Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case. This study serves as a base case for all 2011 and 2012 studies.

  2. 2022 PC1 – Common Case • Central Question: What impact will future load growth and generation needs (as defined by the input assumptions) have on transmission congestion in the Western Interconnection? • These Results will be used as the starting input assumptions for all 2011 and 2012 studies. • Results follow…

  3. 2022 Common Case Results – Annual Generation by Resource Type

  4. DRAFT

  5. 2022 Common Case Results – Region to Region Transfers Hourly transfers Presented at the end of this presentation.

  6. 2022 Common Case Results – Most Heavily Utilized Paths • “Most Heavily Utilized” = A path that meets any one of the following criterion (10-year plan utilization screening): • U75 > 50% • U90 > 20% • U99 > 5% • Uxx = % of year that flow is greater than xx% of the path limit

  7. 2022 Common Case Results – Most Heavily Utilized Paths

  8. Hourly region-to-region transfersAZNMNV To Ca_S

  9. Hourly region-to-region transfersBasin To AZNMNV

  10. Hourly region-to-region transfersBasin To Ca_N

  11. Hourly region-to-region transfersBasin To Ca_S

  12. Hourly region-to-region transfersCa_NTo Ca_S

  13. Hourly region-to-region transfersCanada To NWUS

  14. Hourly region-to-region transfersNWUS To Basin

  15. Hourly region-to-region transfersNWUS To Ca_N

  16. Hourly region-to-region transfersNWUS To Ca_S

  17. Hourly region-to-region transfersRMPA To AZNMNV

  18. Hourly region-to-region transfersRMPA To Basin

  19. Hourly region-to-region transfersCalifornia Net Export Hours of net export = 6053 hrs

  20. Questions or thoughts on this study?