480 likes | 783 Views
Town Hall Meeting. February 16, 2010. Town Hall Meeting Summary. Town Hall Meeting held January 12, 2010 400 attendees Audience & survey comments Uniforms Locations Mascots/Sports Transportation Staffing Safety & Security. Class sizes Student Programs Text books Technology
E N D
Town Hall Meeting February 16, 2010
Town Hall Meeting Summary • Town Hall Meeting held January 12, 2010 • 400 attendees • Audience & survey comments • Uniforms • Locations • Mascots/Sports • Transportation • Staffing • Safety & Security • Class sizes • Student Programs • Text books • Technology • Curriculum & Instruction • Office/Building Reassessments
Hickman Mills High School and Ruskin High School Ervin Middle School and Smith-Hale Middle School Current Building Configurations
Building Configurations Hickman Mills and Ruskin
Hickman Mills High School Ruskin High School HMHS RHS
HMHS RHS
HMHS RHS RHS HMHS RHS
Building Configurations Ervin and Smith-Hale
Ervin Middle School Smith-Hale MS EMS SHMS
EMS SHMS
EMS SHMS EMS SHMS
Smith-Hale Structural Concerns • In the 1980's it was obvious there were some problems with the structure of Smith-Hale . The center of the building in the student wing was settling and causing damage. There was an assessment done approximately 15 years ago when Dr. Jerry Cooper was the Superintendent that verified there were problems that would eventually need repair. At that time, the assessment stated that the building would need some work, but was not structurally unsound. When the Media Center was added to Smith-Hale there was some mud jacking work done, that included putting concrete piers under the front of the building to keep it from settling further. This was funded by the bond money that was specifically set aside for that work. This work eliminated the problems in the main office area. However, there was not enough money to complete the mud jacking in the front of the building, so it did not extent down the north end of the building. As a result there was some additional settling in the rest room by the main entrance of the building, causing some cosmetic and structural problems. The next summer the mud jacking was completed which eliminated the structural problem, although there are still cosmetic issues due to the mud jacking. Since that time there has been no additional structural damage discovered at Smith-Hale Middle School.
Process inclusive of Tenure and Certification of Staff Staffing Process will be reviewed and aligned with master schedules Missouri Statue (Chapter 168) will be followed for staffing purposes Staffing Update
SPED Staffing • Staffing is based on program needs • State law • Federal law • Compliance • Individual Education Programs (IEP) • IDEA
SPED Current Staffing • 38 teachers • 4 lead teachers • 2010 – 2011 Proposed Staffing: • 34 teachers • 3 lead teachers
Projected Student Numbers for Grades 10-12 • Currently 165 students (grades 10-12) • 107 students at Hickman (grades 9-12) • 10 SPED teachers • 104 students at Ruskin (grades 9-12) • 9 SPED teachers • Projected Number of Teachers (grades10-12) • 12 teachers • 1 Lead teacher
Projected Student Numbers for Grades 8-9 • The projected number for grades 8 & 9 is 135 students • Currently 117 students at Ervin • 9 SPED teachers • 1 Lead Teacher • Currently 96 students at Smith-Hale • 10 SPED teachers • 1 Lead Teacher • Projected Number of Teachers (grades 8 & 9) • 10 teachers • 1 Lead teacher
Projected Student Numbers for Grades 6 & 7 • The projected number for grades 6 & 7 is 163 • The projection is based on the population of students currently in grades 5 & 6 • Projected Number of Teachers(grades 6 & 7) • 12 teachers • 1 Lead teacher
8800 Blue Ridge • District occupies 12,993 sq. ft. • Special Services, Grants, Security and Curriculum and Instruction Staff • $117,178.08 paid annually • Utilities and maintenance are paid
Buildings and Grounds • Located at 4005 Martha Truman Road • Interest expressed by outside vendor to lease the space • Relocate B & G to a district facility
Baptiste Educational Center • 5401 East 103rd Street • Early Childhood and Parents as Teachers, GED/Plato Program, CODE (Gifted Education), Nutrition services, Technology, STAR Academy (over-aged 8-9th grade students, Transition Program (6-12 graders), Day Treatment Program
Recommendations forBaptiste Educational Center • Early Childhood – New Structure Fall 2010 • CODE – Recommendation to Relocate • STAR Academy (Day, Transition, STAR, GED/Plato) • Nutrition Services - TBD • Technology - TBD
Plans for Support Staff • Curriculum & Instruction • Special Services • Buildings & Grounds • Nutrition Services • Technology • Residency • Security • Grants & Special Projects • Print Shop
MSHAA Update • Certified as 1 High School • Listed as Hickman Mills School District High School until Site and Name is Decided
Transportation Update • Durham Contract Expires July 2010 • 1 Year Renewable Option • Upon Final Selection of Site, Durham will begin routing and cost associated with new configuration
Facilitator For Focus Groups • Students • Parents • Community Patrons • Questions for Students: • What do you think is the most exciting thing about the schools combining? • What questions do you have about the schools combining?
Next Steps • Next Steps • Board of Education Work SessionFebruary 24, 2010