What if ?. Scrum 3. Product Backlog. Features for our website: Sign In Hate Button S hare on a social network Search bar Comments. Scrum Break Down. Sprint 1- Initial Start Up Get ideas down Get a general direction on what were doing
E N D
What if ? Scrum 3
Product Backlog • Features for our website: • Sign In • Hate Button • Share on a social network • Search bar • Comments
Scrum Break Down • Sprint 1- Initial Start Up • Get ideas down • Get a general direction on what were doing • Establish agreement on how the rest of the project will go • Sprint 2- Start Web Development • Start designing website • Decide what is going were • Make layout
Scrum Break Down • Sprint 3- Finalizing • Continue work on website • Finalize and begin testing phase • Wrap-up • Sprint 4- Development • Deploy website
Scrum 3 Backlog • Items completed during scrum 2: • Reconfigured the kids and mature audience pages • Created a new about page • Created a parent “questions” page • Added photos • Reconfigured sidebar • Added widgets • Re-edited home page
Defect list "Top Posts and pages" heading located on the right contains links that are broken such as: • Kids Section is irrelevant and broken and just needs to be removed. • The Like button needs to be Hate button