1 / 5

Red River District Transportation Network

Red River District Transportation Network. Dallas Fort Worth Regional Gateway. 3 inbound jet arrivals daily from Louisville, Kentucky. 1 inbound jet arrival daily from Rockford, Illinois.

Download Presentation

Red River District Transportation Network

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Red River District Transportation Network

  2. Dallas Fort Worth Regional Gateway 3 inbound jet arrivals daily from Louisville, Kentucky. 1 inbound jet arrival daily from Rockford, Illinois. Tuesday through Thursday we have 9 inbound jets that flow through our network with 2DA and NDA volume. These jets are processed on our DFW Day sort. DFW is the largest origin feed of NDA to Worldport in Louisville.

  3. Domestic Hubs in Red River The District has 4 major sorting facilities. These facilities process both air and ground shipments. They are located in Dallas, Mesquite, DFW and Fort Worth. We have over 3200 employees assigned to these facilities. We are served by three major rail heads in Alliance, Mesquite and Garland.

  4. Domestic Hubs in Red River

  5. Transportation Network We have 578 tractor trailer drivers within our territories served. Our Transportation Network runs 24/7. We travel between 4.4 and 4.8 million miles a month. Daily miles are between 219 and 221,000 miles per day. Our fuel spend is between $2.9 and $3.2 million dollars per month. Our tire and power units spend is between $160k and $195 per month. Major corridors of I-45, I-35, I-30 and I-20. Inclusive off major metropolitan loops as well. On time network issues with construction with 15 minutes being considered late. Overtime and service disruptions to customers.

More Related