An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DAQ Hardware status - overviewR. Stokstad • DOM Main Board • Schedule (Minor) • Design (Przybylski) • Firmware (Stezelberger) • Testing (Goldschmidt) • DOR Board (Sulanke) • Master Clock Unit (Nygren, Sulanke) • ---------------------- • Time Calibration, Cable measurements (Stokstad, Sulanke, Hardtke) Individual presentations for the above to be in Mons proceedings

  2. Rev 2 board

  3. Icecube DOM MB Status and Development Schedule • April – Oct '03 • Rev 2 test and development (22 boards) • Oct – Nov ’03 • Rev 3 fabrication and test (16 boards) • Nov ’03 – Mar ’04 • Rev 4 fabrication and test (60 boards) • March – June ’04 • Rev 5 for deployment (420 boards)

  4. Rev 3 status • October – November ‘03 • First 4 cards due Oct 22, 12 more to follow 5 days after approval • Changes from Rev 2 address memory performance at temperature and signal quality issues • Testing at LBNL will include manual tests and STF testing • Temp cycling of bare and loaded boards • +65, -40degC 10 cycles • First 4 cards to UW, later to LBNL • 8 cards to UW, 8 cards to LBNL

  5. Rev 4 plans • November – March ‘04 • Design modifications as indicated by Rev 3 tests and internal review • Final parts selection for reliability • 60 cards to be fabricated • “Qualification test” at UW • Longer term temperature tests • String operation tests • Some boards used for development at LBNL

  6. Rev 5 plans • Initial production review November ‘03 • Based on Rev 3 and Rev 4 tests • Earlier than usual to allow long-lead parts purchasing • Production readiness review - January ‘04 • Based on initial Rev 4 tests • Qualification testing • Vendor qualifications • Fabrication process approval

  7. Rev 5 Production (March – June ’04) • Full production and Q/A procedures in place • All parts as selected for reliability • ATWD production run including qualification tests • Any differences between Rev 4 and Rev 5 require formal Engineering Change Procedure and re-qualification testing • Fabrication begins March ‘04 • Testing begins April ’04 • Delivery April - June ‘04

  8. Some Changes made in Rev 3 • EPXA4 Baseline (The larger FPGA) • Hi-Reliability Part Substitutions • Primary Oscillator; Corning (Hi-Rel 2560A-0009) • High-Rel DC-DC Converter; Power-One brand • Low impedance Power Distrib.to SDRAM • 2 x 12 Channel ADCs vs. 1 x 8 Channel for monitoring • Q/A Tests Added to Plan; Coupons on PCB • Noise Related Layout Changes • Fabrication procedure changes

  9. Tuning for Physics Performance • •On-Board Flasher Performance Tuning- UV LED gives < 10ns FWHM pulse - Blue LED gives ~13 ns FWHM pulse • x0.25 x 2 x 8 gain for ATWD PMT inputs • Extend Input Clipping Range [+2.4..-3.0] • Stronger ATWD Drivers • Optimize ATWD Driver Output Impedance to minimize ringing • fADC channel gain adjustment for 12 bits

  10. DOMMB Block Diagram

  11. Firmware • CPLD (lowest level programmable logic device) Almost finished. Smallr changes needed for Rev 3 and to make the design more robust. • FPGA • STF 99% Done for testing • ConfigBoot Preliminary Versionminimal boot • IceBoot Preliminary Versionnormal boot • DOMAPP ~50% Done for data taking For software development purposes the SFT FPGA can be used for the ConfigBoot and the IceBoot FPGAs

  12. Data Buffer SRAM 2 x 256Kx16 P C I - C o r e DOM 1..4 PCI Bus Altera FPGAEP20K200E DOM 5..8 Config JTAG Reload JTAG JTAG Altera PLD EPM7064 FLASH 1M x 8 Clock 96 V Cable Interface #4 Cable Interface #3 Cable Interface #2 Cable Interface #1 DOR card • Firmware Status • Production Status, Rev. 0 • Planned Production, Rev. 1

  13. 96V DOM Power DOR, DOM Readout card Quad Cable Con. Power Switch Comm. DAC Clock & Time String port Comm. ADC PLD Comm. Rec. FPGA FLASH SRAM JTAG ICECUBE Meeting, Mons October 2003 13

  14. DOR Rev. 0, Main Firmware Status • PCI Bus control including DMA (..120 MB/s) & Interrupts • Parallel control of 2 wire pairs / 4 DOMs • 1MBit/s serial data rate, (50KB/s per DOM) • DOM_a/b polling • Automatic cable length adaptation • Software initiated but firmware controlled time calibration • Three running firmware versions: • DOR_TEST, after production test • vDOM, includes two virtual DOMs for Linux driver test • DOR, final version, under development

  15. Production Status • Rev. 0, 10 DORs running at : UW 2x, Bartol 1x, LBNL 7x • 20 more in production now, ready in Dec. 2003 • 4 stay at DESY, 16 go to ? Planned Production, Rev. 1 • Redesign ready in January • first test in Feb., production of 60 if o.k. • 60 ready in April 2004 • 60 DORs -> sufficient to control 480 DOMs

  16. DOMMB Test Plan • Select well functioning DOM MBs (including delay board) suitable for integration into DOMs to be deployed in IceCube/IceTop. • For boards which are not well functioning, provide information to aid understanding, debugging and fixing. • Provide some DOMMB characterization: optimum running parameters, etc. • Be able to handle an expected “steady state” flow of 55 boards/week.

  17. Initial Tests • Visual inspection, Power to board • Load “released” firmware and software in dedicated setup (1 board at a time) • Get “boot prompt” and tests that cannot be done in DOR-based setup (if any) Burn-in • Multiple heating and cooling cycles (+65C to -40 C) to catch infant mortality cases. • Boards powered and some testing during burn-in • Power cycles during burn-in • Full operational test at the end to identify bad boards.

  18. Testing Setup • STF (Simple Test Framework) based: STFServer (DOMMB) and STFApp (Test-Control PC) • All tests defined with Pass/Fail and Input and Output Parameters • All Info saved to database (db) • A db query program to see waveforms, output parameters, histograms, etc.

  19. Example of STF test atwd_pulser_spe test Average of 1000 waveforms in 1 sec.

  20. Master Clock Unit: Function • Create and distribute stable 20 MHz source to all DOM Hubs in IceCube DAQ. • DOR cards mirror MCU time, calibrate DOMs • Link “IceCube Time” to GPS time . • Provide robust real-time time verification. • Motivation: detect any error condition in less than 1 sec

  21. Some System Requirements • The DOM Hub will be capable of stand-alone operation, (use the DSB 20 MHz clock) • This facilitates many testing activities • The IceCube MCU will be capable of full operation in the absence of GPS input • Could happen that GPS signal interrupted • IceCube MCU operation shall not require that all DOM Hubs are operational. • Independence of strings during commissioning.

  22. Accuracy and Precision • GPS satellites are synchronized to the US Naval Observatory. • The USNO atomic clocks maintain time to < 2x10-15 day-1. • GPS stability degraded to ~4x10-8second-1 by triangulation errors. • DOM local clocks stable to < 1 x 10-10 second-1. • GPS much less stable than DOM local clocks (seconds scale) • However, GPS will display better long-term stability (hours scale) •  Master Clock unit must employ a source with better short-term stability than GPS, yet must still match long-term GPS time. •  Use commercial atomic clock “linked” to GPS over long-term

  23. Master Clock Unit (MCU) Status • Draft Requirements Documentexists • Specific Implementation proposals have been made by Sulanke and Przybylski. • Plan is that Sulanke will design and fabricate this subsystem at DESY.