An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Point4 R.F. – Powering tests –Installation – Cryo Q6 Q6 Q5 Q5 DFBAG DFBAH • RF interlocked zone bb-ms

  2. Point4 R.F. – Powering tests –Installation - Cryo LSS4L RF LSS4R Left modules Right modules D3-D4 Q5-Q6 LU 80 120A 2 2 4 1 4 RF Cryo Commissioning /RF Interlock HC Access NEEDED to LSS4R DFB CryogenicCommissioning ? Beam Instrum. Tests ? Week 46 Cryo OK for 4.5 K operation ElQAat Cold RF Cryo Commissioning/RF Interlock Week 47 CL Connection QPS ISTs PCC PIC2 Powering to Nominal RF cryo-commissioned RF tests – LSSL4/R4 NO-access Week 48 RF tests – LSSL4/R4 NO-access Week 49 bb-ms

  3. Point4 R.F. – Powering tests –Installation - Cryo LSS4L RF LSS4R Left modules Right modules D3-D4 Q5-Q6 LU 80 120A 2 2 4 1 4 Purge – 2d – Flushing Powering Studies RF tests – LSSL4/R4 - NO ACCESS Week 50 Flushing RF tests – LSSL4/R4 - NO ACCESS Week 51 RF would work during Xmas holidays if Cryo… Week 52/1 Flushing Heat run with all the available circuits RF tests – LSSL4/R4 - NO ACCESS Week 03 ElQA _TP4B bb-ms

  4. Point4 R.F. – Powering tests –Installation - Cryo • Cryo-commissioning of the RF approximately 2W • First week after the RF good cryo conditions are met Interlock tests: access allowed • No interferences between Powering tests and RF activities • Low impact on A34 – BI and ElQA • For an unexpected HC/IC intervention: 2hr to stop the RF tests + 1 day per week access if needed (Oliver B.) • First RF test – the interlocked door is it far enough? People can safely work just beyond it? (on Q6) • RF would work during Christmas if the stable cryo condition would be maintained. Q6 Q6 Q5 Q5 DFBAG DFBAH bb-ms

More Related