1 / 12

ITU-T Structure: Points of Agreement and Further Discussion - Revised Version 06/Oct/2004

This document outlines areas of consensus and disagreement regarding the structure of ITU-T Study Groups. Issues are categorized by colors (Green, Yellow, Red) with specific recommendations for each Study Group.

mpetrick
Download Presentation

ITU-T Structure: Points of Agreement and Further Discussion - Revised Version 06/Oct/2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMMITTEE 4 ITU-T Structure: Points of agreement and Issues needing further discussion Revised version 06/Oct/2004

  2. Notes • The identified areas refer to the SG structure • Certain specific proposals related to SG mandate, points of guidance and allocation of Recommendations will be dealt with later in the meeting • Reference: Doc. 39, Annex 2

  3. Three categories • Green light • Consensus exists: all expressed proposals in essential agreement • Yellow light • Essential consensus exists: majority of proposals in agreement with minor issues • Red light • Consensus possible but not yet achieved: different proposals have been identified and further discussion will be needed

  4. Green Light (1) • SG A/3(Tariff and accounting principles, telecommunication economic and policy issues) • SG D/15(Optical and other Transport Network Infrastructures) • SG E/9(Integrated broadband cable networks and television and sound transmission ) • SG G/12(Performance and Quality of Service) • SG K/17(Security, Languages and Telecommunications Software)

  5. Green Light (2) • SG B/5(Protection against electromagnetic environment effects) • SG C/6(Outside Plant and related indoor installations) • Retain as separate SGs • Encourage collocated meetings whenever possible, as determined by the SG Management Teams

  6. Green Light (3) • SG F/16(Multimedia Terminals, Systems and Applications) • Agree that SG F will continue • If SG 2 Option 1 is adopted, adjust the mandate and points of guidance for SG F accordingly (involves Block 2D: Human Factors) is this still an issue?

  7. Yellow Light (1) • SG H/4(Telecommunications Management) • Agree to continue current SG 4 as a separate SG • Decision on SG 2 may affect the complete work program, if SG 2 Option 1 is adopted (Docs. 40 + Cor. 1; 58) is this still an issue?

  8. Yellow Light (2) • SG J/SSG(Mobile Telecommunications Networks) • Agree to retain as a separate SG • Encourage co-located meetings at appropriate levels with SGs 11 and 13 as determined by the SG Management Teams (include text in Res. 2)

  9. Yellow light (3) • SG M/2 (Operational aspects of service provision, networks and performance) • Preponderance of views: keep SG 2 as a discrete SG • NNAR is recognized as a key study item for both existing networks and NGNs • Consensus: a discrete SG M, successor to SG 2 • but details of work need further discussion • Possible way forward on NNAR and NGN: • Mandate close interaction with SG I/13 on NNAR for NGNs (by enhancing text of Q.A/2?)

  10. Red Light (1) • Allocation of TDR work • Not yet discussed • SG I/13 (NGN)  C40 • SG K/17 (Security)  C61 (presumed) • SG M/2  C52 Add.15, C58 (presumed)

  11. Red Light (2) • SG I/13 (Next Generation Networks - architecture, evolution and convergence) • SG L/11 (Signalling requirements and protocols for convergence toward NGN) • Consensus on mandating an NGN SG • Work program dependency on decision about SG2 & Signalling Options • No consensus yet: • Merge now? Re-assess in 2 years? Keep separate? • Possible way forward: TBD

  12. Options Explained • “Signalling Options” • Option (i) – Architecture and signalling in separate SGs • Option (ii) – Architecture and signalling in single SG • Option (iii) – Compromise: through 2006 & reassess • SG 2 Options reduced • Option 2 • Option 2 minus (part of) NNAR

More Related