An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mahatma Gandhi NREGA: Review Meeting of JPCs 3.8.2017

  2. Agenda items • Progress • Mission 2 Cr fruit Saplings • 13th Five year Plan Approach • SAKSHAM Training • Labour Material Ratio • Delay Compensation System (DCS) • ABPS – DBT • Geo Mgnrega • SECC Survey • Bare Foot Technicians • Focal Area Interventions • MIS issues • Mission water Conservation • PFMS • Audit of 2016 17 • 7 Registers • Work Completion • Work Files and their Maintenance • SECURE Soft issues

  3. Person Day Generation 1.8.2017

  4. Observations on PD Generation

  5. Mission 2 Crore Fruit Saplings

  6. Activities Involved

  7. Activities Involved

  8. Requirement of Seeds

  9. Requirement of Seeds...

  10. 13th Plan - Mahatma Gandhi NREGSWatershed based planning

  11. Potential of MGNREGS

  12. Limitations of MGNREGS – Govt of India findings

  13. Kerala situation

  14. Kerala situation... All the 14 districts are declared as drought affected Acute water shortage in summer months Ground water level is fast depleting Wells are drying up in summer months Symptoms of desertification are slowly emerging in different parts of the State

  15. Kerala situation...

  16. What Next ?

  17. Ridge Area GPs

  18. No. Of GPs in each district

  19. Piloting in 29 GPs

  20. Steps involved in the Planning Process Step 1 • Collection & over laying of maps – • Land Use/Land Cover Map • Hydro-geological Map • Soil Map • Relief Map • Drainage Map • Administrative Map KSLUB has agreed to supply watershed maps of the 245 GPs

  21. Step 2 • Primary Data Collection (Base line survey) • About Private Land • Public Land, and • Drainage Lines • By forming NHGs of 50 Families each • Survey Forms may be prepared • Volunteers may be selected from among these families and thoroughly trained • Present condition and possible interventions may be collected

  22. Step 3 • Secondary Data Collection • Rainfall Pattern • Soil Erosion • Run off • Hydro - geological conditions • Major Crops etc • May be collected from various depts/agencies

  23. Step 4 With the help of maps available • Transect Walk may be conducted for final verification of boundaries and finding out location specific issues and possible interventions

  24. Step 5

  25. Identification of Interventions

  26. Continued

  27. State Technical Resource Team (STRT), District Technical Resource Team (DTRT) & Block Technical Resource Team (BTRT)

  28. SAKSHAM Training Programme • GoI has decided to launch cascading mode of training programme for STRT, DTRT and BTRT • The prime objective of the training programme is to equip the technical persons of MGNREGS in watershed based planning and NRM implementation • The key areas to be addressed in SAKSHAM are :- • Geo-hydrology • Application of GIS in planning • NRM works design • Understanding Climate Resilience • Skills on preparation of DPR for MGNREGS

  29. SAKSHAM Training

  30. Role of STRT • Role of STRT is two pronged • To develop a well defined planning process to prepare comprehensive watershed plans • To act as a State level trainer’s group – with the mandate of • Training Need Assessment • Module preparation • Training Plan preparation • Training of DTRT

  31. No. Of DTRTs to be selected

  32. BTRT Trainings – From 3rd Oct to 17th Nov

  33. BTRT Trainings

  34. Issues

  35. Wage Material Ratio

  36. Delay Payment

  37. Delayed Payment 17-18 (Blocks)

  38. Delayed Payment 17-18 (Blocks)

  39. Delayed Payment 17-18 (Blocks)

  40. Delayed Payment 17-18 (GPs)

  41. Delayed payment for more than 60 days

  42. ABP Conversion

  43. Aadhaar Camp Calendar Status

  44. Aadhaar Enrollment/Seeding during Camps