An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Best Practices” Strategies for HVAC Equipment

  2. Best PracticesAcoustic Design • Answer the 5 questions • Use 3 to 5 dBA safety factor • Cursory review on every project; in depth review when warranted • Assess site ambient noise levels • Evaluate airborne and structure-borne transmission • System problems require system solutions

  3. Best PracticesSpecifications • Design specs preferred over performance specs • Evaluate objective and subjective criteria • Indoor criteria: NC, RC, NCB, RC Mark II • Outdoor criteria: Zoning and ordinance criteria • Place in Division 15 with equipment • Specify single source • Specify turnkey where installation critical • Require submission for approval as “or equal” 10 days before bid date

  4. Do’s & Don’ts For: • Outdoor Chillers • Indoor Chillers • Pumps • Cooling Towers • Vibration Isolation • AHU Duct Silencers • Curb Mounted RTU • Room Diffusers • VAV Boxes

  5. Best PracticesOutdoor Chillers • Thickened slab for rooftop • Avoid steel coil springs for screw chiller isolation • Attenuate compressor tones with sound blankets • Special consideration for remote evap piping • Evaluate building and property line noise • Optimize aerodynamic performance to achieve total system pressure loss of .25” to .35” w.g. • Use molded neoprene flexes • Flexible conduit power-up

  6. Treating Compressor Circuits

  7. Treating Air Intakes

  8. Treating Condenser Discharge

  9. Enclosure Treatments

  10. Best Practices Indoor Chillers • Thickened slabs and walls • Locate chiller over columns when above grade • Avoid steel coil springs for screw chiller isolation • Attenuate compressor tones with sound blankets • Use molded neoprene flexes • Flexible conduit power-up

  11. Treating Compressor Circuits

  12. Enclosure Treatments

  13. Best Practices Pumps • Neoprene isolators for slab on grade installations • Inertia bases with steel coil springs for above grade mechanical rooms • Inertia base mass to equal 1 ½ times pump total weight • Support suction and discharge elbows on isolation base • Use molded neoprene flexes • Acoustic treatment rarely needed

  14. Best Practices Cooling Towers • Avoid point isolation • Properly position continuous spring rails • Best isolation is restrained spring isolators with dunnage beams • Use molded neoprene flexes • Silencer banks for air inlet attenuation • Acoustical barrier walls for radiated noise

  15. Rooftop Curb Mounted AHU Best Practices • Integral vibration/seismic curb • Lock down internal isolation • Add mass inside curbs • Seal (acoustic) duct drops • Dissipate supply breakout noise above deck • Plenum style acoustic curbs

  16. In-Curb Treatment

  17. Integrated Sound Attenuators

  18. External Acoustic Duct Lagging 7 - 9 dB reduction in first 3 octave bands

  19. Rooftop Unit Condenser Section Treatments

  20. Best Practices VAV Boxes • Lined discharge 10’ to 15’ or XLP silencer • First take-off minimum 4’ from discharge • Minimum 3 diameters straight inlet • Maximum velocity 1000 FPM • External wraps for casing radiated noise

  21. Best PracticesVibration Isolation • Follow ASHRAE guidelines for static deflection • Verify deflections in field • Avoid suspended piping in mechanical rooms below noise sensitive space • Use bases to pick up cantilevered equipment loads • Inspect for proper adjustment of isolator lockdowns and snubbers • Follow IBC for seismic anchorage requirements

  22. Best Practices AHU Duct Silencers • Avoid high pressure drop models • Evaluate self generated noise • Apply ∆p correction factors • Stay 3 equivalent duct diameters away from fittings • Maximum ∆p 0.3” w.g.

  23. Best Practices Ductwork • Limit high aspect ratios • Select duct gauges and add stiffeners to control ductwork “oilcanning” • Follow SMACNA & ASHRAE duct design guidelines to control regenerated noise • Isolate ductwork in mechanical room and at wall & riser penetrations • Locate silencer 2 to 3 equivalent duct diameters from fittings • Consider self generated noise when selecting silencers • Always flex ductwork at equipment connections

  24. Room Diffusers Best Practices • Select diffusers for 6 to 8 NC points below room target NC • Long radius 90° flexes to diffusers add 1 to 3 NC points • “Kinked” flexes add 7 to 9 NC points • Balancing dampers should be located three equivalent duct diameters away from diffusers and fittings • Open plenum return grilles may require lined elbow