160 likes | 368 Views
Operation Manual for the 8-Stage Davis Rotating Uniform size-cut Monitor (8-DRUM). Steven S. Cliff, Michael P. Jimenez-Cruz, and Thomas A. Cahill *DELTA Group, University of California, Davis *Detection and Evaluation of Long-range Transport of Aerosols (530)752-1120 sscliff@ucdavis.edu
E N D
Operation Manual for the 8-Stage Davis Rotating Uniform size-cut Monitor (8-DRUM) Steven S. Cliff, Michael P. Jimenez-Cruz, and Thomas A. Cahill *DELTA Group, University of California, Davis *Detection and Evaluation of Long-range Transport of Aerosols (530)752-1120 sscliff@ucdavis.edu mpjimenezcruz@ucdavis.edu tacahill@ucdavis.edu
8-DRUM Description Pump Port Inlet Stage # Slotted orifice 8 1 Drum shaft 7 2 Drum cup 6 3 5 4 Air Path
Inlet Installation Lightly greased o-rings w/silicone
DRUM cover removal DRUM cover
Inserting drums Clear cover #1 Drum (with substrate)
DRUM Cleaning(orifice floss) strip of paper (~5 mm wide) Orifice Ethanol
DRUM Cleaning(orifice floss) Paper strip
Drum Cleaning(drum cups) Ethanol KimWipe
Drum Cleaning(back-blowing orifice 1-4) Air Path Orifice Orifice Clean air duster Air Path Clean air duster
Drum Cleaning(back-blowing orifice 5-8) Orifice Clean air duster Air Path
DRUM Cleaning(dusting drum cup) Clean air duster
DRUM Vacuum Connection Quick-Connect For pump hose
DRUM Pump Connection Quick-Connect For pump hose