Shriram foundry Ltd. . Wel - Come. GLOBAL Quality circle. Shriram foundry Ltd. . Quality Circle Introduction. Name of Quality Circle : Globle. Co- ordinator Mr. S.V. Vatharkar. Facilator Mr. G.A.Powar. Members. Mr. Arun borage. Mr. Rajesh B erde. Mr. Bharat Patil.

mura
Download Presentation

Wel - Come

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Shriram foundry Ltd. Wel - Come GLOBAL Quality circle

  2. Shriram foundry Ltd.

  3. Quality Circle Introduction Name of Quality Circle : Globle Co-ordinator Mr. S.V. Vatharkar Facilator Mr.G.A.Powar Members Mr. Arun borage Mr. Rajesh Berde Mr. Bharat Patil Mr. Vijay Patil. Mr. LaxmanPatil Mr. Shamravokamble. Mr. Arun borage

  4. Data Collection of core production of 3 month

  5. Cause analysis for low core production Man Machine Is the specific machine used.? Is the leakage amine problem? Is operator un skill ? Is it due to improper operating Is the machine need to be reconditioning Is the machine cylinder not working properly ? Is operator temporary Are the control plan followed ? Is the tool ok needs to modification? Is the sand inspected ? Is the proper injection system for core making ? Tool Method Material

  6. Cause selected action Man Machine Is the leakage amine problem? Is the machine need to be reconditioning. Is the machine cylinder not working properly ? Low core production Is the tool needs to modification? Is the proper injection system for core making ? Tool Method Material

  7. Before action Tooling photograph. MAIN CORE BOX TOOLING

  8. Core box Tool. Machine

  9. After action tooling photograph. Ejection system provided. Gassing system modified.

  10. After action tooling photograph. Additional gas vent provided.

  11. CORE PRODUCTION

  12. CORE PRODUCTION INCREASED. 27Noscore production increased per shift