Lec 16, Ch.8, pp.312-328: Delay progression, and ramp metering (objectives)

Lec 16, Ch.8, pp.312-328: Delay progression, and ramp metering (objectives). Learn how to estimate delays using the Webster delay model Be familiar with a few methods for timing signals of arterial routes Understand the concept behind ramp metering (through reading and video)

Download Presentation

Lec 16, Ch.8, pp.312-328: Delay progression, and ramp metering (objectives)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lec 16, Ch.8, pp.312-328: Delay progression, and ramp metering (objectives) • Learn how to estimate delays using the Webster delay model • Be familiar with a few methods for timing signals of arterial routes • Understand the concept behind ramp metering (through reading and video) • Skip pp. 316-318 actuated signals (CE562)

  2. What we cover in class today… • Steps to estimate delay using the Webster delay model • Signal timing of arterial routes (concept only, CE562 & 662 discuss signal coordination in detail) – see if you can identify these in the field • Freeway ramp metering

  3. Delay estimate using the Webster delay model (Know where you get the values from) Delay is a measure of effectiveness of intersections. The Webster delay model gives average stopped delay at a signalized intersection. where dj = average delay per vehicle on j-th approach during i-th phase. Pay attention to these units! C = cycle length (sec) Vj = adjusted peak volume (i.e., flow rate) on j-th approach (pc/lane/sec) i = proportion of cycle length that is effectively green, Gei/C xj = degree of saturation for the j-th approach, Vj/ isj sj = saturation flow for the j-th approach (pc/lane/sec), hence is isjcapacity P = % correction, ranging from 5% to 15% for normal conditions

  4. Methods for timing signals of arterial routes One-way streets: Usually “Progressive” system

  5. Methods for timing signals of arterial routes (cont) Two-way with preference on one direction

  6. Methods for timing signals of arterial routes (cont) Two-way with equal treatment of both directions: n = number of signals in one simultaneous pattern

  7. Freeway entrance (on) ramp control • Justification: You need to justify the installation of ramp metering because it may increase delays of those who try to enter freeways more than justified. • Ramp metering must result in a reduction of the total expected delay to traffic in the freeway corridor, that includes freeway and local streets. Rate = 4 to 15 veh/min • Criteria: At least one of these must be satisfied. • Recurring congestion exists in the main flow OR a severe accident hazard at the freeway entrance • Signals (meters) are needed to accomplish transportation system management objectives • Signals are needed to solve congestion problems caused by non-recurring congestion  ball games, etc.