1 / 9

ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2013

ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2013 OUR ROADS – PLANNING FOR THE FUTURE/ROLE IN NATIONAL AND LOCAL DEVELOPMENT HODSON BAY HOTEL, ATHLONE, MAY 2013. 1. Our Roads - Planning for the Future/Role in National and Local Development.

mya
Download Presentation

ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2013 OUR ROADS – PLANNING FOR THE FUTURE/ROLE IN NATIONAL AND LOCAL DEVELOPMENT HODSON BAY HOTEL, ATHLONE, MAY 2013. 1

  2. Our Roads - Planning for the Future/Role in National and Local Development Community Involvement in Roadworks Simon Walton, Senior Engineer Kilkenny County Council

  3. Background to CIR in County Kilkenny • Circular RW 4/94 • LAs should ‘actively seek the support of local communities for improvement and maintenance work on non-national roads’ • Restoration Improvement Programme ’95 • 5% of Restoration Grants can be set aside for CIR Schemes • Focus on the improvement of the road network on which the LA is not in a position to carry out regular maintenance work

  4. Background to CIR in County Kilkenny • Restoration Programme/CIR • Prepare multi annual programmes in line with the strategic needs of the road network • Set aside 5% (7.5%) of Restoration Grant for CIRs so as to; • Enable structural improvements to the local tertiary network • Harness community support where it most available • Reduce the maintenance burden on the LA • Facilitate Elected Representatives

  5. Non-National Road Network Co. Kilkenny • Regional 421km (14%) • Local Primary 795km (27%) • Local Secondary 1350km (46%) • Local Tertiary 397km (13%) • Total No. LT Roads 748

  6. CIR Schemes in County Kilkenny since 1995 • Total Number of Schemes 303 (41%) • Total Length Improved 156km (39%) • Total Investment €8,141,213 • Rest. Grant €6,534,554 • Local Contributions €1,606,659

  7. LT Condition Index Rating for Co. Kilkenny 2013 43% of LT Roads require reconstruction/structural overlay 12% of LT Roads require surface restoration 45% of LT Roads are Condition Rating 7 – 10 41% of LT Roads have had a CIR Scheme since 1995

  8. CIR Schemes in County Kilkenny 2013 • Waiting list of 69 applicants/LT Roads • 56 (81%) expressed ongoing commitment to CIR • 1 requested withdrawal • 12 did not reply

  9. CIR Summary Position for Co. Kilkenny • Well established community support for CIR Schemes on the LT Network • Significant support from Elected Members for the Restoration Grant discretion (7.5%) • Including LT roads in Restoration Programmes removes requirement for local contributions • Many LT Roads are beyond the provisions of routine/localised maintenance • Suggest retention of discretion for individual local authorities to reserve 7.5% of Restoration Grants for CIR Schemes.