1 / 33

Ground Motion Measurement in Accelerator Test Facility at KEK

Ground Motion Measurement in Accelerator Test Facility at KEK. ・KEK ・ICEPP ( Univ . of Tokyo ) ・J-Power. Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd. 【 Research Team and Members】. ( KEK).

myra-snyder
Download Presentation

Ground Motion Measurement in Accelerator Test Facility at KEK

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ground Motion Measurement in Accelerator Test Facility at KEK ・KEK ・ICEPP (Univ. of Tokyo) ・J-Power Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  2. 【Research Team and Members】 (KEK) R.Sugahara, S.Takeda, M.Yoshioka, H.Yamaoka Joint Research (ICEPP) (J-Power) T.Itoh, K.Tada Y.Nakayama S.Komamiya S.Yamashita Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  3. 【Contents of the measurement】 ①Huddling test ②Measurement around the beam line - Movement and operation of instruments - Natural frequency of the trestle ? • Ground Motion in • Accelerator Test Facility ? Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  4. 【Measurement Instrument】 - Servo type velocity meter “VSE355G2” - (manufactured by Tokyo Sokushin Co.,Ltd.) - Specification - Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  5. 【Huddling Test (1)】 - Measurement Points - P4J P3J P1J P2J - Observation - 6pm, Feb. 9, 2004 - 6am,Feb. 10, 2004 30 minutes consecutive duration for 12 hours Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  6. 【Huddling Test (2)】 - Power Spectrum Density and Coherence - Component : X ( Orthogonal to the beam line ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  7. 【Huddling Test (3)】 - Power Spectrum Density and Coherence - Component : Y ( Parallel to the beam line ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  8. 【Huddling Test (4)】 - Power Spectrum Density and Coherence - Component : Z ( Vertical ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  9. P1J P4J P1J P4J P2J P2J P3J P3J 【Measurement around the beam line (1)】 - Measurement Points - - Observation - 2pm, Feb. 10, 2004 – 6pm, Feb. 11, 2004 30 minutes consecutive duration for 28 hours Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  10. P1J P2J P3J P4J 【Measurement around the beam line (2)】 “ Time Series in Velocity (1) “ Component : X ( Orthogonal to the beam line ) Nighttime 22:00-22:30, Feb. 10, 2004 Daytime 12:00-12:30, Feb. 11, 2004 Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  11. P1J P2J P3J P4J 【Measurement around the beam line (3)】 “ Time Series in Velocity (2) “ Component : Y ( Parallel to the beam line ) Nighttime 22:00-22:30, Feb. 10, 2004 Daytime 12:00-12:30, Feb. 11, 2004 Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  12. P1J P2J P3J P4J 【Measurement around the beam line (4)】 “ Time Series in Velocity (3) “ Component : Z ( Vertical ) Nighttime 22:00-22:30, Feb. 10, 2004 Daytime 12:00-12:30, Feb. 11, 2004 Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  13. “ Standard Deviation in Velocity (1) “ Component : X ( Orthogonal to the beam line ) 【Measurement around the beam line (5)】 Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  14. “ Standard Deviation in Velocity (2) “ Component : Y ( Parallel to the beam line ) 【Measurement around the beam line (6)】 Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  15. “ Standard Deviation in Velocity (3) “ Component : Z ( Vertical ) 【Measurement around the beam line (7)】 Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  16. Daytime (09:00-17:00) Nighttime (19:00-03:00) 【Measurement around the beam line (8)】 “ Power Spectrum Density (1) “ Component : X ( Orthogonal to the beam line ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  17. Daytime (09:00-17:00) Nighttime (19:00-03:00) 【Measurement around the beam line (9)】 “ Power Spectrum Density (2) “ Component : Y ( Parallel to the beam line ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  18. Daytime (09:00-17:00) Nighttime (19:00-03:00) 【Measurement around the beam line (10)】 “ Power Spectrum Density (3) “ Component : Z ( Vertical ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  19. Daytime (09:00-17:00) Nighttime (19:00-03:00) 【Measurement around the beam line (11)】 “ Integrated Spectrum (1) “ Component : X ( Orthogonal to the beam line ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  20. Daytime (09:00-17:00) Nighttime (19:00-03:00) 【Measurement around the beam line (12)】 “ Integrated Spectrum (2) “ Component : Y ( Parallel to the beam line ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  21. Daytime (09:00-17:00) Nighttime (19:00-03:00) 【Measurement around the beam line (13)】 “ Integrated Spectrum (3) “ Component : Z ( Vertical ) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  22. 【Measurement around the beam line (14)】 “ Coherence (1) ” Component : X ( Orthogonal) Daytime (09:00-17:00) Nighttime (19:00-03:00) Daytime (09:00-17:00) Nighttime (19:00-03:00) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  23. 【Measurement around the beam line (15)】 “ Coherence (2) ” Component : Y ( Parallel ) Daytime (09:00-17:00) Nighttime (19:00-03:00) Daytime (09:00-17:00) Nighttime (19:00-03:00) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  24. 【Measurement around the beam line (16)】 “ Coherence (3) ” Component : Z ( Vertical ) Daytime (09:00-17:00) Nighttime (19:00-03:00) Daytime (09:00-17:00) Nighttime (19:00-03:00) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  25. Tsukuba Epicenter 【Earthquake record (1)】 Date : 21:07, Feb. 10, 2004 ( When measuring around the beam line ) Epicenter : East of Chiba Depth of hypocenter:65km JMA Magnitude:4.2 【 Z : Vertical 】 【 X : Orthogonal 】 P1J P2J P3J P4J Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  26. Epicenter Tsukuba 【Earthquake record (2)】 Date :14:04, Feb. 11, 2004 ( When measuring around the beam line ) Epicenter :South of Ibaraki Depth of hypocenter:70km JMA Magnitude:3.7 【 Z : Vertical 】 【 X : Orthogonal 】 P1J P2J P3J P4J Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  27. 【Earthquake record (3)】 “ Minimum and Maximum in velocity, Amplification ratio “ 〔Earthquake 1 : 21:07, 2004.2.10 , Epicenter : East of Chiba〕 〔Earthquake 2 : 14:04, 2004.2.11 , Epicenter : South of Ibaraki〕 Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  28. 【Comparison (1)】 1) “ATF at KEK” Feb. 10, 2004 – Feb. 11, 2004 2) “D03 P.S.Bldg. at KEK” Dec. 27, 2002 – Dec. 28, 2002 3) “SPring-8” June 14, 2003 – June 15, 2003 D3 P.S.Bldg. SPring-8 ATF Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  29. 【Comparison(2)】 Component : X “Power Spectrum Density and Integrated Spectrum “ Nighttime (19:00-03:00) Nighttime (19:00-03:00) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  30. 【Comparison(3)】 Component : Y “Power Spectrum Density and Integrated Spectrum “ Nighttime (19:00-03:00) Nighttime (19:00-03:00) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  31. 【Comparison(4)】 Component : Z “Power Spectrum Density and Integrated Spectrum “ Nighttime (19:00-03:00) Nighttime (19:00-03:00) Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  32. 【Summary】 - ATF at KEK - • The peak around 0.2Hz and 3Hz is observed in all • measurement points. • Horizontal natural frequency of the trestle in ATF • is thought to be around 10 - 12 Hz. • As the peak excited only P1J can’t be observed, • vertical natural frequency of the trestle in ATF is • not clear. • In the P1J (the measurement point on the trestle), • the vibration is amplified during the earthquake. Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

  33. 【Summary】 - Comparison (KEK, SPring-8) - • The level of ground motion in the KEK ismuch • higher than that in the SPring-8. • The amplitude of the peak around 2-3Hz is almost • the same betweenthe ATFand the D3 power supply • building at the KEK. • There is a difference in the peak around 0.2Hz, • because the observed season is different. Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

More Related