BRAHMS Cu+Cu Status

BRAHMS Cu+Cu Status. Running smoothly without major issues - 0.43 nb -1 recorded since Jan. 16th - 12M MRS 11M FS Triggers collected Currently running “soft physic” (low-p T ) program - Goal: 2 nb -1 delivered - Will be done in a week High-p T program

naava
Download Presentation

BRAHMS Cu+Cu Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRAHMS Cu+Cu Status • Running smoothly without major issues - 0.43 nb-1 recorded since Jan. 16th - 12M MRS 11M FS Triggers collected • Currently running “soft physic” (low-pT) program - Goal: 2 nb-1 delivered - Will be done in a week • High-pT program - Goal: 4 nb-1 delivered - Will be luminosity limited - Higher luminosity and/or b* squeeze will help reaching the goal • Minimum low energy run required for physics: ~ 2 weeks RHIC Planning Meeting

  2. RHIC Planning Meeting

  3. ZDC Rates for the week W S S RHIC Planning Meeting

  4. FS spectrometer trigger rates RHIC Planning Meeting

  5. b* squeeze test RHIC Planning Meeting