Model Data Collection Meeting Announcement. Entergy Transmission Planning Summit New Orleans, LA July 8, 2004. Goals of Model Data Collection Meeting. Ensure greater accuracy in long-term transmission system models Ensure consistency in load forecasting & data submittal
E N D
Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Goals of Model Data Collection Meeting • Ensure greater accuracy in long-term transmission system models • Ensure consistency in load forecasting & data submittal • Entergy has proposed a standard format for load-serving entities to submit load and resource forecasts • Provide a forum for transmission customers to provide updated information on their facilities (e.g., generator characteristics, plant load data) • Provide a forum for Entergy to share with stakeholders its approach and philosophy in transmission system planning and modeling
The meeting will cover: • Proposed template for submitting load and resource forecasts • Entergy’s modeling and transmission system planning philosophy • Stakeholders’ concerns and issues regarding system modeling The meeting will NOT cover: • Coordination of load and resource modeling with and for external systems • This process is addressed in Entergy’s participation in the VAST and VST study groups. • Specific study results or models
Tentative Timeline of Model Update Process October Entergy hosts stakeholders meeting to obtain customer input and suggested changes to long-term power flow models Oct. – Dec. Entergy updates models and posts on OASIS Dec. – Feb. Stakeholders provide additional input, suggested revisions, or corrections Mar. – May Entergy incorporates latest changes into models and coordinates model update with other SERC members via the Regional study groups
When: October 26, 2004 9AM to Noon Where: New Orleans (exact location TBD) Participants: Load-Serving Entities within the Entergy Control Area
Load & Resource Workbook • Contact Information • Demand – System • Demand by Bus (Summer) • Demand by Bus (Winter) • Weather Normalization • Capacity (Summer & Winter) • Firm Resource • Firm Transactions • Non-Firm Resources • Additional Information Draft Workbook Template Available on OASIS for Review & Comments http://oasis.e-terrasolutions.com/OASIS/EES/trans_planning_summit_summary.htm
Demand – System Summary • Internal Demand • Standby Demand • Total Internal Demand • Direct Control Load Management • Interruptible Demand • Net Internal Demand
Demand by Bus (Summer & Winter) • PSS/E Bus # • Point of Delivery (Entergy Station Name) • Point of Delivery (Customer Station Name) • MW • MVAr • Power Factor
Firm and Non-Firm Resources • Generator Name • PSS/E Bus # • PSSE Bus Name • PSSE Machine ID • Jurisdiction • Summer & Winter • Pmax • Pmin • Qmax • Qmin • MW Output Owned • Preferred Dispatch Order
Firm Transactions • OASIS # • Customer Making Request • Point of Receipt • Point of Delivery • Source • Sink • MW Requested • MW Granted • Service • Begin • End • Status • Seller Comments • Renewal Deadline • Renewal Comments