1 / 19

Improving Flood Risk Management in the Informal Settlements of Cape Town

Improving Flood Risk Management in the Informal Settlements of Cape Town . Bethany Bouchard Ashley Goncalo Michael Susienka Kevin Wilson. Liaisons: Mogamat Kenny Barry Wood Catchment, Stormwater, & River Management . The Forecast. Our Mission Information Collection

nadine
Download Presentation

Improving Flood Risk Management in the Informal Settlements of Cape Town

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improving Flood Risk Management in the Informal Settlements of Cape Town Bethany Bouchard Ashley Goncalo Michael Susienka Kevin Wilson Liaisons: Mogamat Kenny Barry Wood Catchment, Stormwater, & River Management

  2. The Forecast Our Mission Information Collection Addressing the Issues Findings and Recommendations Questions Worcester Polytechnic Institute

  3. Our Mission Conduct a Flood Risk Index (FRI) Pilot Study Create Guidelines to Assist Communities Generate Recommendations for the City of Cape Town Worcester Polytechnic Institute

  4. Information Collection • Settlement Visits • On-Site and City Interviews • Case Study Research • GIS and Rainfall Data Analysis • Brainstorming Worcester Polytechnic Institute

  5. Incoming Residents are Unaware of High Risk Areas Addressing the Issues Associated with Flooding Poor Location Infrastructure Blockages Lack of Resources Increased Flood Risk within the Informal Settlements Worcester Polytechnic Institute

  6. Flood Risk Index – Pilot Study Prototype Flood Risk Index Purpose: • To prioritize settlements at higher flood risk for housing upgrade • To determine appropriate community capacity measures to be implemented in a settlement • How it works: • Based on measurable indicators • Probability of a flooding event • Topography • House structure susceptibility • Community capacity and awareness

  7. Flood Risk Index – Pilot StudyMapping High-Risk Areas • Purpose: • Indicate areas with high flood risk based on topographical location • Use findings for topographical indicator in the FRI

  8. Flood Risk Index – Pilot Study Flood Incident Reporting Worcester Polytechnic Institute

  9. Improved topographical data collection methods More precise records of displaced residents Flood marshals Flood Risk Index – Pilot StudyRecommendations Worcester Polytechnic Institute

  10. Flood Risk Index – Pilot StudyFlood Marshals • Sets foundation for FRM at community level • Consistent data collection • Community education Worcester Polytechnic Institute

  11. Creating Guidelines to Assist Communities

  12. Creating Guidelines to Assist Communities Examples of how to mitigate seepage via structural adaptations including realistic photographs

  13. Creating Guidelines to Assist Communities

  14. Creating Guidelines to AssistCommunities Example of how to mitigate leakage in household: How would the City communicate these suggestions to the settlement residents? Worcester Polytechnic Institute

  15. Creating Guidelines to Assist Communities School Folders and EducationProgram Signs in Public Areas (e.g. taps, bathrooms, public phones) • Children as audience • Tangible, multi-use product • Increases community capacity Worcester Polytechnic Institute Analyzed positives, negatives, audience, amount to be generated, estimated cost

  16. Results and DeliverablesRecommendations for the City of Cape Town • Recommendations • Informational database accessible to all relevant departments Finding Need to strengthen communication between City departments Worcester Polytechnic Institute

  17. Results and DeliverablesRecommendations for the City of Cape Town • Recommendations • Implementation of community-based disaster risk management program • Collaboration with academic institutions (such as Disaster Mitigation for Sustainable Livelihoods Programme, UCT), and/or other NGOs Finding Minimal management at the community and household level Worcester Polytechnic Institute

  18. Results and DeliverablesRecommendations for the City of Cape Town • Recommendations • Community preference of method of rubbish storage/removal • Incentive program Finding Litter blockages, underutilization of skips Worcester Polytechnic Institute

  19. Thank You for Your Attention! Questions? Worcester Polytechnic Institute

More Related