1 / 23

Founded in 1985 with 16 shareholders today Resources: Office in Rajamäki 6 persons

Our Company. Founded in 1985 with 16 shareholders today Resources: Office in Rajamäki 6 persons Office in Tampere 2 persons Office in Trollhättan 1 person At workshop in Pori 2 persons At the field 50+ persons

nairi
Download Presentation

Founded in 1985 with 16 shareholders today Resources: Office in Rajamäki 6 persons

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Our Company Founded in 1985 with 16 shareholderstoday Resources: Office in Rajamäki 6 persons Office in Tampere 2 persons Office in Trollhättan 1 person At workshop in Pori 2 persons At the field 50+ persons Ourriskclass is 1 (the lowest) / AAA Turnover2013: 6,7 milj. €

  2. OurLocations

  3. OurCorner Stones VISION Weare the mostreliablepartner for ourcustomers Wekeepourpartnerscostefficiently in production MISSION HAPONKESTÄVÄT GOALS Reliability Wedowhatwepromise Customersatisfaction Ourservice is based on needs, and changeswiththem HAPONKESTÄVÄT Productivity Wecontinusouslydevelopourways of working Innovativity Webring new ideasforward v

  4. PROJECTS ”Withprofessionalproud”

  5. AGNICO EAGLE – GOLD MINE 2008- …. SCOPE OF SERVICE • Project 2008, autoclave, flashvessel • Maintenancesince 2009 – • Materialstorage and handlingsince 2012-

  6. IITTALA – 2009 SCOPE OF WORK • Project, renewing of complete 120 tnsglasstank

  7. NEW BOLIDEN – 2012 SCOPE OF WORK • Project, rubbermembrane and bricklining (65.000 bricks)

  8. KUUSAKOSKI - 2011 SCOPE OF WORK • Renewing of complete aluminium meltingfurnace LASIVANNA 120 TONNIA

  9. UPCAST – since 1985 SCOPE OF WORK • Lining of Cu-meltingfurnaces, • Locations 2012 – Austria, Brasil, Pakistan, Poland, Ukrain LASIVANNA 120 TONNIA

  10. LIME KILNS

  11. Andritz/Steuler/Tekmurcontractsince 2009 Lime Kiln Service Scope: Brickwork, maintenance and warehousing Bricklining and castingwork for limekilns Emergencystock Training of Bricklayers

  12. CREMATORIES ”Turnkey Solutions”

  13. CREMATORIES – since 1990

  14. POWER & HEAT ”Plannedoperationalreliability”

  15. SERVICE AND MAINTENACE – since 1985 Survey and inspections Maintenanceplanning During the maintenace • Inspectingneeds for repairs • Estimation of upcomingmaintenancescope and timeframe • Report of situation • Maintenaceplan and scope • Upcomingscope of repairneed • Alocatingresources for the repairs • Documentation • Inspection and repair of plannedscope • Planning of upcomingrepairs • Documentation of situation

  16. SERVICE AND MAINTENACE Kunnossapitoprojekteissa mukana 80-luvulta Ourcustomersamongothers: • Fortum Power & Heat • Metsäliitto • UPM • Olkiluoto • PVO • Wide selection of

  17. Power & Heat, greenfieldprojects

  18. INDUSTRIAL SERVICE ”StrategicalPartnership”

  19. LUVATA – since 2008 Continuouse Service on a daily base Workforce 2 bricklayers Scope: Service repairs for linings, planning of maintenance and supervision. Kilns, lines, ledals and otherequipmentsused in the fundarys Weare at site for keepingourcustomer in production

  20. PRECASTED SHAPES ”Togetherwe design the future”

  21. PRECASTING – since 2008 Workshop in Pori Shape design and casting Mould design and manufacturing Preheating to 600C and 1200C

  22. ThankYou! ” Weare just a phonecallaway”

More Related