1 / 2

Electronics Manpower

In collaboration with PH-ESE (see Jorgen’s slides) Current manpower from PH-ESE: Electronics coordination RICH front- end+system Velo front- end+system Request that these continue for M&O of existing LHCb Future manpower requests (upgrade): Electronics coordination

najila
Download Presentation

Electronics Manpower

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. In collaboration with PH-ESE (see Jorgen’s slides) • Current manpower from PH-ESE: • Electronics coordination • RICH front-end+system • Velo front-end+system • Request that these continue for M&O of existing LHCb • Future manpower requests (upgrade): • Electronics coordination • Velo upgrade (Front-end chip design, Velo readout system) • Other requests may come • LHCb will need to fund a fellow + technical students for Velo activities2013 - 2015 Electronics Manpower

  2. Electronics Funding • LHCb upgrade relies on finalisation of ‘White Paper’ projects in 2012: • Complete prototyping of Rad-hard Optical Link (WP3) • Complete prototyping of DC-DC convertors (WP2) • Common items for all sub-detectors: • LHCb will need funds to contribute to shared production in 2013 of: • GBT chipsets (WP3) • Versatile Link components (WP3) • DC-DC convertors (WP2) • Funds required for contribution to Velo Front-end chip • (see Paula’s slide)

More Related