In collaboration with PH-ESE (see Jorgen’s slides) Current manpower from PH-ESE: Electronics coordination RICH front- end+system Velo front- end+system Request that these continue for M&O of existing LHCb Future manpower requests (upgrade): Electronics coordination
E N D
In collaboration with PH-ESE (see Jorgen’s slides) • Current manpower from PH-ESE: • Electronics coordination • RICH front-end+system • Velo front-end+system • Request that these continue for M&O of existing LHCb • Future manpower requests (upgrade): • Electronics coordination • Velo upgrade (Front-end chip design, Velo readout system) • Other requests may come • LHCb will need to fund a fellow + technical students for Velo activities2013 - 2015 Electronics Manpower
Electronics Funding • LHCb upgrade relies on finalisation of ‘White Paper’ projects in 2012: • Complete prototyping of Rad-hard Optical Link (WP3) • Complete prototyping of DC-DC convertors (WP2) • Common items for all sub-detectors: • LHCb will need funds to contribute to shared production in 2013 of: • GBT chipsets (WP3) • Versatile Link components (WP3) • DC-DC convertors (WP2) • Funds required for contribution to Velo Front-end chip • (see Paula’s slide)