1 / 4

CESM Data Management & Distribution Plan and Submission of CMIP-5 Simulations

CESM Data Management & Distribution Plan and Submission of CMIP-5 Simulations. Jim Hurrell Chief Scientist, CESM. CESM DATA MANAGEMENT & DATA DISTRIBUTION PLAN (DRAFT: January 2011). Updates and Deletion of Old Material Consistency with CSL proposal

nakia
Download Presentation

CESM Data Management & Distribution Plan and Submission of CMIP-5 Simulations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CESM Data Management & Distribution Plan and Submission of CMIP-5 Simulations Jim Hurrell Chief Scientist, CESM

  2. CESM DATA MANAGEMENT & DATA DISTRIBUTION PLAN (DRAFT: January 2011) • Updates and Deletion of Old Material • Consistency with CSL proposal • definition of Development and Production simulations • data management/retention plan • Definition of PIs • Minor revision to data release timeline; authority of SSC • Update to case and file naming conventions (to come) • Input by 10 January • Send to SSC • Final version by end of January Special Journal of Climate Collection: Timeline • CCSM4 drafts due for web posting in March: submit on 1 May • CESM1 drafts due for web posting in June: submit on 1 Aug • Late papers go through Chair of CESM

  3. CCSM4 Long-term Experiments for CMIP5 • 1850 control integration (01/10) • 1% yr-1transient CO2 (11/09) • Abrupt 4 x CO2 (04/10) • 20th Century ensembles (12/09 – 03/10, but one in 07/10) • AMIP simulations (complete through 2005) (12/09 – 03/10, but being extended) • RCP 8.5 21st Century ensembles (04/10, but one in 10/10) • RCP 2.6 21st Century ensembles (04/10 – 07/10) • RCP 4.5 21st Century ensembles (04/10 – 06/10) • __________________________________________________________________________________________________________________________________________________________ • RCP 6.0 21st Century ensembles (11/10 – still running) • Last Millennium & Mid-Holocene (10/10 and 11/10; LM extension 2005 underway) • Last Glacial Maximum (underway) • Control, 20th Century, RCP 8.5, 6.0, 4.5, and 2.6 MOAR (still running) • __________________________________________________________________________________________________________________________________________________________ • Single forcing runs (ORNL) ? May 2011

  4. CESM Long-term Experiments for CMIP5 • 1850 control integration (Chemistry) (07/10) • 1850 control integration (WACCM) (12/10) • 1850 control integrations (BGC) prescribed + emissions (12/10) • 20th Century (Chemistry) ensembles (06/10 - 11/10) • 20th Century (WACCM) ensembles (06/10 – 09/10) • 20th Century (BGC) ensembles (06/10 – 12/10?) • 20th and 21st Century Carbon Feedback Experiments (running through 03/11) • RCP 8.5 (BGC) (running through 03/11) • RCP 4.5 (WACCM) ensemble (10/10 – 11/10) • RCP 8.5 (WACCM) ensemble (running through 03/11) • CAM5 (ORNL) control, 20th and 21st Century Sept 2011

More Related