CoP Preparation H. Feuchtgruber. PACS Commissioning Phase Overview (1). FDIR SFT HeII Chopper controller parameter tuning Grating controller parameter tuning Full functional test (FFT) Short performance test (SPT) Ge:Ga detector tuning Telescope background measurement
E N D
CoP Preparation H. Feuchtgruber CoP Plan and Timeline
PACS Commissioning Phase Overview (1) • FDIR • SFT HeII • Chopper controller parameter tuning • Grating controller parameter tuning • Full functional test (FFT) • Short performance test (SPT) • Ge:Ga detector tuning • Telescope background measurement • Bolometer detector tuning CoP Plan and Timeline
PACS Commissioning Phase Overview (2) • Instrument User Manual - Covers FDIR, SFT, Chopper and Grating tuning [ftp://ftp.mpe.mpg.de/people/pacs/PACS_User_Manual/PACS-ME-UM-002_Issue_1_3_User_Manual.pdf] - Conceptually tested during SOVT2 real time commanding • PACS Commissioning Phase Plan - PACS-ME-PL-024, issue 1.2 + attachments E:\PACS Project\CoP Plan\PACS Commissioning Phase Plan PACS-ME-PL-024 issue1.2.pdf CoP Plan and Timeline
Commissioning Phase Details (1) CoP Plan and Timeline
Commissioning Phase Details (2) CoP Plan and Timeline
CoP X-HSPOT Proposals HF: repetition of IST and TBTV HF: repetition of IST and TBTV HF: repetition of IST and TBTV HF: take a full spectrum of the early telescope KO, MS MS, KO KO, TM PR, HD MN, UK CoP Plan and Timeline
CoP X-HSPOT Proposals Example: GeGa_Bias_1 CoP Plan and Timeline
Analysis & Uplink Feedback (1) CoP Plan and Timeline
Analysis & Uplink Feedback (2) CoP Plan and Timeline
Analysis & Uplink Feedback (3) • Analysis procedures for: FDIR, SFT HeII, FFT, SPT-SPEC and SPT-PHOT exercised already twice during IST (report available) and TBTV (report in progress). • A similar report will be generated based on the results of these tests during commissioning phase. CoP Plan and Timeline