1 / 24

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT. What is EIA?. EIA of projects is defined as a process designed to identify and predict the impact on man’s health and well-being of development projects and to interpret and communicate the information about the impacts.

naoko
Download Presentation

ENVIRONMENTAL IMPACT ASSESSMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENVIRONMENTALIMPACTASSESSMENT

  2. What is EIA? • EIA of projects is defined as a process designed to identify and predict the impact on man’s health and well-being of development projects and to interpret and communicate the information about the impacts. • Aim – to assess the overall impact on the environment of development projects proposed by the public and private sectors.

  3. Objectives • 1. To examine and select the best from the project options available; • 2. To identify and incorporate into the project plan appropriate abatement and mitigating measures; • 3. To predict significant residual environmental impacts; • 4. To determine the significant residual environmental impacts predicted; and • 5. To identify the environmental costs and benefits of the project to the community.

  4. Polisi Negara mengenai EIA • Dalam penilaian kesemua projek projek berkenaan satu taksiran mengenai kesan keseluruhan projek-projek tersebut keatas alam sekitar perlu dibuat. Kementerian dan Jabatan serta Sektor Swasta adalah diwajibkan sebelum memulakan perlaksanaan projek-projek berkenaan, untuk mengenalpasti kesemua kemungkinan kesen alam sekitar danjuga cara-cara mengatasinya.

  5. Taksiran ini akan diambilkira dalam rekabentuk akhir dan perlaksanaan projek-projek tersebut, tetapi akan memikirkan bahawa penggunaan kaedah kaedah penjagaan alam sekitar ini selaras dengan kos pembangunan.

  6. Why we need EIA? • EIA is essentially a planning tool for preventing environmental problems due to an action. • It seeks to avoid costly mistakes in implementation, either because of the environmental damages that are likely to arise during project implementation, or because of modifications that may be required subsequently in order to make the action environmentally acceptable.

  7. Procedures of EIA • The EIA procedure adopted in Malaysia consists of three major steps. • 1. preliminary assessment (penaksiran awal) • 2. detailed assessment (penaksiran terperinci) • 3. review of assessment report (penilaian semula)

  8. Preliminary assessment • The objectives of Preliminary Assessment: • 1. to examine and select the best from the project options available. • 2. to identify and incorporate into the project plan appropriate abatement and mitigating measures; and • To identify significant residual environmental impacts.

  9. Penaksiran awal mengandungi perkara perkara berikut • Mengikuti garis panduan umum yang dikeluarkan oleh panel penilai semula (review panel) • Dimulakan diperingkat awal perancangan projek • Sumber diperlukan sama seperti sumber yang digunakan dalam kajian prakemungkinan (prefeasibility study)

  10. 4. Menggunakan matrik sebagai kaedah penaksiran 5. Data alam sekitar mungkin diperlukan 6. Satu laporan diperlukan

  11. Detailed Assessment • 1. to describe the significant residual environmental impacts predicted from the final project plan; • 2. to specify mitigating and abatement measures in the final project plan; and • 3. to identify the environmental costs and benefits of the project to the community.

  12. Penaksiran terperinci mengandungi perkara perkara berikut 1. Garis panduan umum berserta syarat syarat khusus bagi tiap tiap projek dikeluarkan 2. Sumber yang diperlukan sama seperti yang digunakan untuk kajian kemungkinan (feasibility study)

  13. 3. Kaedah penaksiran dipilih berdasarkan jenis dan bentuk projek 4. Pengutipan data alam sekitar adalah dimestikan 5. Satu laporan adalah diperlukan

  14. EIA Review Process • The objectives of review process: • 1. to critically review the Detailed Assessment reports; • 2. to evaluate development and environmental costs and benefits of the final project plan; • To formulate recommendations and guidelines to the project approving authority relevant to the implementation of the project.

  15. Menilai semula (review) mengandungi perkara perkara berikut 1.Menilai semula dijalankan oleh panel bebas yang dilantik dan bertanggungjawab secara langsung kepada Menteri, Kementerian Alam Sekitar

  16. 2. Pendapat dan pandangan akan dijemput dari agensi agensi berkaitan alam sekitar dan dari orang awam 3. Cadangan akan dihantar kepada pehak berkuasa yang meluluskan cadangan projek 4. Jangka masa maksima yang dibenarkan diperingkat ini ialah dua bulan

  17. Proses penting dalam EIA • Terdapat 6 proses penting. • Kenyataan mengenai perlunya satu satu projek i) penerangan mengapa projek berkenaan dicadangkan, memberi fokus kepada objektif atau tujuan projek ii) satu ‘kenyataan keperluan’ yang memfokuskan kepada aspek sosial, budaya, ekonomi dan faedah faedah lain yang timbul dari projek

  18. 2. Kenyataan mengenai alternatif projek i) Mengambilkira kesan keatas alam sekitar dari tiap tiap alternatif ii) Penaksir perlu mengenalpasti lokasi projek, rekabentuk dan menaksir tiap tiap alternatif dari sudut teknikal,ekonomi dan alam sekitar serta menerangkan sebab sebab dalam memilih satu satu alternatif

  19. 3. Pengumpulan maklumat alam sekitar i) Ini adalah penting bagi EIA untuk menentukan sejauh mana kesan alam sekitar ditanggung oleh masyarakat ii) Penaksir perlu mendapat maklumat yang diperlukan dari badan atau organisasi yang berkaitan dengan alam sekitar, universiti dan institusi penyelidikan iii) Pengumpulan maklumat alam sekitar mestilah bersesuaian dengan saiz projek.

  20. 4. Penglibatan orang awam / masyarakat - Sebagai bantuan kepada perancangan projek - Membantu perancang projek dalam i) Memantau keperluan masyarakat serta memastikan arah aliran projek untuk memenuhi keperluan tersebut

  21. ii) Mengenalpasti kesan kebendaan dan psikologi dari projek keatas masyarakat iii) Mengukur dan mempromosikan penerimaan masyarakat keatas projek untuk mengelakkan kegagalan projek iv) Memantau perubahan nilai dalam masyarakat mengenai alam sekitar

  22. 5. Penilaian dalam EIA i) Penilaian EIA merupakan sesuatu yang perlu dijalankan oleh perancang projek sebagai asas kepada pembuat keputusan yang baik dan kepada pehak berkuasa yang meluluskan projek ii) Penilaian adalah penting di tiga peringkat perancangan projek

  23. a) Pemilihan alternatif projek dari sudut lokasi dan rekabentuk yang dicadangkan b) Pemilihan kaedah pengurangan dan pencegahan kesan alam sekitar c) Perbandingan antara ( trade-off) pemuliharaan alam sekitar dan pembangunan Dua kaedah yang boleh digunakan ialah analisis kos faedah (BCA) dan analisis keberkesanan kos (AKK)

  24. 6. Pengawasan kesan alam sekitar (monitoring environmental impacts) i) Sebagai kawalan keatas pengurusan alam sekitar bagi projek dan untuk memastikan projek berkenaan mematuhi syarat syarat yang dikenakan semasa kelulusan diberi keatas projek ii) Memberi maklumbalas (feedback) untuk memperbaiki data mengenai kesan alam sekitar sebagai asas terhadap perancangan projek di masa akan datang.

More Related