MHI#10 号機の 2 回目の pre-tuning. Process log Status of pre-tuning. Period : 2010/5/31 ~ 6/2 Process : Field flatness measurement, pre-tuning, measurement of total length and etc. Workers : T. Shishido, Kirk (KEK), M. Asano (Nihon Advanced Technology). Kirk. Process log.
E N D
MHI#10号機の2回目のpre-tuning Process log Status of pre-tuning Period : 2010/5/31 ~ 6/2 Process : Field flatness measurement, pre-tuning, measurement of total length and etc. Workers : T. Shishido, Kirk (KEK), M. Asano (Nihon Advanced Technology) STF Cavity Group Meeting @2010/6/7 Kirk
Process log 5/31 10:00~ Field flatness measurement after 1st V.T. 1297.0097MHz/95.5% 6/1 9:30 Detachment of jigs / Setting to tuning machine 10:40 Pre-tuning starts 11:20 Cell #1 was expanded (+1.5mm -3.0mm +1.6mm 0.0mm) 間違えて伸ばし過ぎたので、一度縮めてやり直す。 14:30 Cell #6 was expanded (+2.5mm 0.0mm) 1297.0574MHz/97.9% 16:00 Measurement of dumbbell and total length 6/2 9:30 Adjustment of total length of cavity / Attachment of jigs 10:35 Field flatness with jigs 1297.1066MHz/97.4% [O.K.] STF Cavity Group Meeting @2010/6/7
Initial Status of pre-tuning これよりCell #1とCell #6を伸ばすことに決めた。 STF Cavity Group Meeting @2010/6/7
Final Status of pre-tuning Without jigs With jigs STF Cavity Group Meeting @2010/6/7