1 / 4

MHI#10 号機の 2 回目の pre-tuning

MHI#10 号機の 2 回目の pre-tuning. Process log Status of pre-tuning. Period : 2010/5/31 ~ 6/2 Process : Field flatness measurement, pre-tuning, measurement of total length and etc. Workers : T. Shishido, Kirk (KEK), M. Asano (Nihon Advanced Technology). Kirk. Process log.

Download Presentation

MHI#10 号機の 2 回目の pre-tuning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MHI#10号機の2回目のpre-tuning Process log Status of pre-tuning Period : 2010/5/31 ~ 6/2 Process : Field flatness measurement, pre-tuning, measurement of total length and etc. Workers : T. Shishido, Kirk (KEK), M. Asano (Nihon Advanced Technology) STF Cavity Group Meeting @2010/6/7 Kirk

  2. Process log 5/31 10:00~ Field flatness measurement after 1st V.T. 1297.0097MHz/95.5% 6/1 9:30 Detachment of jigs / Setting to tuning machine 10:40 Pre-tuning starts 11:20 Cell #1 was expanded (+1.5mm  -3.0mm  +1.6mm  0.0mm) 間違えて伸ばし過ぎたので、一度縮めてやり直す。 14:30 Cell #6 was expanded (+2.5mm  0.0mm) 1297.0574MHz/97.9% 16:00 Measurement of dumbbell and total length 6/2 9:30 Adjustment of total length of cavity / Attachment of jigs 10:35 Field flatness with jigs 1297.1066MHz/97.4% [O.K.] STF Cavity Group Meeting @2010/6/7

  3. Initial Status of pre-tuning これよりCell #1とCell #6を伸ばすことに決めた。 STF Cavity Group Meeting @2010/6/7

  4. Final Status of pre-tuning Without jigs With jigs STF Cavity Group Meeting @2010/6/7

More Related