Transportation Research Board Report Ray Derr www.trb.org
Upcoming TRB Meetings • Sep 14-15: Integrated Corridor System Management Modeling Best Practices Workshop (Irvine) • Oct 13-14: Infrastructure Security Workshop (Rutgers) • Oct 29: EMS Workshop & Mid-Year Meeting (Washington) • Jan 10-14, 2010: TRB Annual Meeting [Investing in our Transportation Future—BOLD Ideas to Meet BIG Challenges] • Jun 10, 2010: Workshop on Benefits and Requirements for a Cooperative National Traffic Speed Data System (Seattle) www.trb.org
Executive Project 20-07/238—Conceptual Development of an AASHTO Guide to System Operations and Management (Complete, Delivered to AASHTO) Project 20-07/253—SSOM Strategic Plan Update (Complete, Delivered to AASHTO) Project 3-94—Development of an AASHTO Guide for Systems Operations and Management (Dec 2010) www.trb.org
Technology & Reliability Project 03-66—Traffic Signal State Transition Logic Using Enhanced Sensor Information (Nov 2009) Project 03-87—Proactive Ramp Management Under the Threat of Freeway-Flow Breakdown (Nov 2009) Project 03-90—Operation of Traffic Signal Systems in Oversaturated Conditions (Sep 2010) Synthesis 40-03—Adaptive Traffic Control Systems: Domestic and Foreign State of Practice www.trb.org
Technology and Reliability (p2) Synthesis 40-10—Traffic Signal Retiming Practices in the U.S. (Jul 2010) Project 20-83(02)—Expediting Future Technologies for Enhancing Transportation System Performance (Oct 2011) Domestic Scan 07-04—Best Practices in Regional Multi-Agency Traffic Signal Operations Management (Feb 2010) Domestic Scan 08-02—Best Practices in Maximizing Traffic Flow on Existing Highway Facilities (Nov 2009) www.trb.org
Technology & Reliability (p3) (Highway Capacity Manual) NCHRP Report 616—Multimodal Level of Service Analysis for Urban Streets Project 03-92—Production of the Year 2010 HCM (Sep 2011) Project 03-96—Analysis of Managed Lanes on Freeway Facilities (April 2011) Project 03-97—Modifications to HCM Signal Analysis to Support Reliability Assessment and Maintenance of Signal Timing (Sep 2011) www.trb.org
Performance Measures Project 20-07/202—Guide to Benchmarking Operations Performance Measures (Complete, Delivered to AASHTO) Synthesis 39-08—Real-Time Traveler Information for the Public (Complete) Project 3-79A—Arterial Performance Measures (Mar 2010) Project 20-24(37)D-Measuring Performance Among State DOTs, Sharing Best Practice—Operations Performance Using Incident Response Time (Apr 2010) Project 8-75—Guidelines for Evaluation and Performance of Congestion Pricing Projects (Nov 2010) Project 8-74—Sustainability Performance Measures for State DOTs and other Transportation Agencies (Aug 2011) www.trb.org
Mainstreaming Ops and Workforce Development E-Circular 133—Glossary of Regional Transportation Systems Management and Operations Terms NCHRP Synthesis 392—Transportation’s Role in Emergency Evacuation and Reentry Project 03-84—Guide for Multistate Transportation Operations Programs (Complete, Delivered to AASHTO) Project 20-77—Transportation Operations Training Framework (Sep 2009) Project 03-80—Traffic Enforcement Strategies for Work Zones (Nov 2009) Project 20-07/221—Traffic Incident Management Program for Worker Safety (Nov 2009) Synthesis 41-07—Operational and Institutional Agreements that Facilitate Traffic Signal Operations www.trb.org
NCHRP 20-07 ProcessResearch for the AASHTO SCOH • Annual Budget of $1,200,000 • Problems Submitted by SCOH Subcommittees • Problems must address pressing needs of the subcommittee • Problems must cost less than $100,000 • Selection made at the Spring and Fall AASHTO meetings www.trb.org
SCOR Desires for 2010 NCHRP • Research problem statements should support AASHTO committee/subcommittee strategic plans • Research problem statements should support the AASHTO Strategic Plan and Vision • Research problem statements should address immediate needs and long term vision • Problem statements should be ranked by the appropriate AASHTO committee/subcommittee • Subgroup problem statements should be ranked by the parent committee/subcommittee • Staged research submittals (e.g., to develop a new manual) should include a plan showing future submittals • Committees/subcommittees should identify the top 2 or 3 issues they face www.trb.org