PV output fluctuates (80% dropouts in 5 sec) TEP will have 250 MW of PV by 2013

The Problem:. PV output fluctuates (80% dropouts in 5 sec) TEP will have 250 MW of PV by 2013 TEP needs forecasts to ramp up generators No forecasts are good enough yet. Our Solutions:. Advanced Numerical Weather Model Irradiance Network and Velocity Model Cloud movie analysis.

Download Presentation

PV output fluctuates (80% dropouts in 5 sec) TEP will have 250 MW of PV by 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Problem: • PV output fluctuates (80% dropouts in 5 sec) • TEP will have 250 MW of PV by 2013 • TEP needs forecasts to ramp up generators • No forecasts are good enough yet Our Solutions: • Advanced Numerical Weather Model • Irradiance Network and Velocity Model • Cloud movie analysis

  2. The Problem: AC Power (kW) Aug 9 Aug 10 time ACC Regulations require Big Solar. Now Utility Operators need Forecasts.

  3. Our Solution #1 Numerical Weather Model Forecast Good for: 2-hr averages 40 hours in advance Our Solution #2 100 Rooftops + Wind Forecast Good for: 10 minute detail 1-2 hours in advance

  4. 34 25 Distribution of ~280 MW 70 MW DG 6.4 5 12 5 23 50 10 35