Total Swimming Pool Refurbishment Solutions recently completed a turnkey project at a prestigious private school in Hertfordshire. The third phase involved the construction of a new changing rooms facility adjacent to the pool enclosure, allowing the school to use the pool in all weather conditions. Despite logistical challenges, the unit was successfully delivered and placed into position, completing the project.
E N D
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS CONTINUATION OF PROJECT AT A PRESTIGIOUS HERTFORDSHIRE PRIVATE SCHOOL - NEW SWIMMING POOL CHANGING ROOMS FACILITY
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS We have recently (2017) commissioned a “TURNKEY” project at a prestigious private school in Hertfordshire where the pool was completely refurbished The third phase of the project was a changing rooms facility adjacent to the pool enclosure This will enable the school to use the pool in times of inclement weather and could even be used all year round
TOTAL POOL REFURBISHMENT SOLUTIONS • Transport has arrived. • The school is 19th century and the access roads were made for transport that did not include arctic lorries. • This posed a real logistical problem and one our motto "results not excuses” was certainly tested to the max • Quite a fete getting on to site
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS Day One Because the access could not accommodate the transport the unit was being delivered on, we had to hire a trailer/tractor and have the unit placed on the trailer sited on the bottom playing field
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS DAY TWO The tractor now had to pull the trailer up to the proposed site, where we had a crane on standby. This then lifted the unit to within 15 feet of the final position DAY THREE We now had to place the unit inch by inch into position
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS What an achievement ! The unit is now in place adjacent to phase two of the project, the swimming pool enclosure
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS The new changing facilities – adjacent to the pool enclosure
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS • This is how the pool was after phase one • With the new pool buildings phase two and three