1 / 8

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

Total Swimming Pool Refurbishment Solutions recently completed a turnkey project at a prestigious private school in Hertfordshire. The third phase involved the construction of a new changing rooms facility adjacent to the pool enclosure, allowing the school to use the pool in all weather conditions. Despite logistical challenges, the unit was successfully delivered and placed into position, completing the project.

natalieh
Download Presentation

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS CONTINUATION OF PROJECT AT A PRESTIGIOUS HERTFORDSHIRE PRIVATE SCHOOL - NEW SWIMMING POOL CHANGING ROOMS FACILITY

  2. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS We have recently (2017) commissioned a “TURNKEY” project at a prestigious private school in Hertfordshire where the pool was completely refurbished The third phase of the project was a changing rooms facility adjacent to the pool enclosure This will enable the school to use the pool in times of inclement weather and could even be used all year round

  3. TOTAL POOL REFURBISHMENT SOLUTIONS • Transport has arrived. • The school is 19th century and the access roads were made for transport that did not include arctic lorries. • This posed a real logistical problem and one our motto "results not excuses” was certainly tested to the max • Quite a fete getting on to site

  4. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS Day One Because the access could not accommodate the transport the unit was being delivered on, we had to hire a trailer/tractor and have the unit placed on the trailer sited on the bottom playing field

  5. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS DAY TWO The tractor now had to pull the trailer up to the proposed site, where we had a crane on standby. This then lifted the unit to within 15 feet of the final position DAY THREE We now had to place the unit inch by inch into position

  6. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS What an achievement ! The unit is now in place adjacent to phase two of the project, the swimming pool enclosure

  7. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS The new changing facilities – adjacent to the pool enclosure

  8. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS • This is how the pool was after phase one • With the new pool buildings phase two and three