TDC2/TCC2 WGstatus report in EATM S. Evrard on behalf of the TDC2/TCC2 WG 18.06.2013 WP breakdown TDC2/TCC2 Visit on June 4th Next issues ENTM agenda
Visit on June 4th: TCSC dose rate measurement by means of Telerob TCSC contact : 11 mSv/h
T4 measurement from RP – 4th June 2013 Ratio D/U ~ 1.8 M. Calviani / E. Nowak - TCC2TDC2 WG meeting
Next actions, topics, issues • Laser scan of TA801 (Thursday 20/06) BE-ABP + DGS-RP • Survey Work package EN-MEF + BE-ABP • New dose rate measurement (Friday 21/06, TBC) EN-HE + DGS-RP • Tech. Spec. for: • Underground IT network EN-MEF + IT-CS • Chilled pipe removal (asbestos ?) EN-CV • Dismantlingworks EN-MEF + DGS-RP • TCSC and Target boxes and monitor storage in B.954 GS-IS • PVC insulationanalysis TE-EPC + EN-MME • Mezzanine floor water tighness issue GS-SE + EN-CV • Riskanalysis (cranes BA80, B954) EN-HE • Shielded containers for target boxes and monitors EN-STI + EN-MEF + DGS-RP • ENTM on July 2nd all WG members
ENTM agenda July 2nd • Rationales for TDC2 Consolidation (S. Evrard) • PlannedActivities (E. Harrouch) • ALARA Optimisation (S. Evrard) • Transport Issues (J-L Grenard) • Waste management (E. Harrouch) • Riskanalysis (E. Harrouch)